A Groundwork company - serving Henderson, NV
A new rear addition with a vaulted beamed ceiling and tall windows
Garage Conversion ADU · Sunrise Manor, NV

Garage Conversion ADU in Sunrise Manor - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Henderson
A garage converted into a guest room and home office
A finished backyard cottage with a small covered porch
A new concrete driveway with a paver border
A stone counter, tile backsplash and open shelf after a kitchen remodel
A remodeled hall bathroom with subway tile and a floating vanity
New architectural shingles with a clean valley
A new casement window over a kitchen sink
A new white vinyl privacy fence with a double gate
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in Sunrise Manor, NV: What It Costs and How It Holds Up to Wind

A Garage Conversion ADU in Sunrise Manor runs $45,000 to $130,000 and takes 3 to 5 months from permit to final inspection. The scope turns your existing attached garage into a permitted second dwelling – insulated walls, new service panel, bath, kitchenette, and a code-rated door assembly that has to hold in a desert windstorm. Call (844) 320-6757 to set up a free on-site estimate, and we’ll walk the garage with you before anyone quotes a number.

Call (844) 320-6757

Why lead with wind on an interior conversion? Because the garage door is the biggest opening on most 89110 houses, and the wrong door or a failing track undoes the whole build the first time a monsoon gust front rolls through the east valley.

How a Garage Conversion ADU Actually Gets Built, Stage by Stage

A remodeled family room with new windows and a window seat

We start each stage only after the one before it passes, and you sign off on selections before we order. Here’s the sequence we run on a Sunrise Manor conversion.

Days 1 – 3: Demo and assessment. Out goes the car door, the opener, any old shelving and the RV parking hardware. We open walls to confirm what the framing actually is – on this stock it’s often a mix of original mid-century studs and later homeowner patches. You decide here whether the old slab stays as finished floor or gets a topping pour and a vapor barrier. Both are legitimate; the second costs more and gives you a flat, dry substrate.

Weeks 1 – 2: Structural and rough-in. We frame the new exterior wall where the overhead door was, add a man door and windows, and run rough plumbing and electrical. You confirm the bath and kitchenette layout now, before drywall, because moving a drain after the slab is cut means cutting again. Expect the service panel upgrade conversation in this window too – a full ADU with its own kitchen and bath usually needs more amperage than the garage circuit had.

Weeks 3 – 4: Insulation, drywall, and the first inspection. Spray foam or batt goes in; in a Sunrise Manor garage, we pay attention to the ceiling plane because so many of these roofs are flat with a parapet and little attic space. Drywall goes up and we schedule the rough-in inspection with Clark County. You pick paint and flooring finishes around this point.

Weeks 5 – 8: Systems and finish. HVAC gets sized for the new square footage (a garage unit sized for storage will not cool a living space in July), plus the bath tile, kitchenette cabinets, and door hardware. This is the longest stretch and the one with the most decisions – finish grade here drives a big chunk of the total, which we cover below.

Weeks 9 – 12: Final inspection and punch list. Clark County signs off, we walk the unit with you, and we fix what the walk turns up. Then the whole thing is covered by our 730-Day Done Right Promise: if it’s not done right, we make it right.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices You’ll Make, and What Each One Costs You Later

  • The door assembly where the car door was. A framed wall with a standard insulated man door and windows is the most common route. An impact-rated or wind-rated door assembly is the alternative, and on the east valley’s exposed lots it’s often the smarter spec – a garage opening is a sail, and a cheap door that racks in a gust takes the track with it. We source through brands like CWS and ES Windows where a rated assembly makes sense.
  • Windows for the new living space. Standard dual-pane or impact-rated glass. Impact glass costs more up front and holds up better through a monsoon season; it also tends to quiet the unit. ECO Window Systems and Mr-Glass are both options we can price side by side.
  • Flooring over the slab. Luxury vinyl plank over a moisture barrier is the value play and handles slab movement well. Tile is more durable at the bath and entry. Polished concrete is the cheapest finish and the least forgiving of a slab that isn’t dead flat.
  • HVAC sizing. A mini-split is often enough for a studio or one-bedroom unit and keeps the electrical load down. A full ducted system costs more but handles a two-bedroom layout better.
  • Kitchenette scope. Sink, two-burner cooktop, and under-counter fridge is the rental-friendly package. Full-size appliances push you toward a bigger service upgrade and more cabinet run.

What a Garage Conversion ADU Costs in Sunrise Manor, NV

A framer checking new wall framing on a home addition

Plan on $45,000 to $130,000 for a full, permitted conversion. A basic studio with a half bath and a mini-split lands near the bottom of that range. A two-bedroom, one-bath unit with its own kitchen, full electrical service upgrade, and impact-rated door and windows lands near the top.

Five things push the number:

  • Size. A single-car garage converts to roughly 250 – 300 sq ft. A two-car gives you 400 – 500. Every hundred square feet adds finishes, framing, and mechanical.
  • Existing condition. Slab cracks, old wiring, and a roof that’s already failing move the number up before you pick a single finish.
  • Moving plumbing and structure. Keeping the bath on the wall nearest the main drain line saves real money. Relocating a drain across the slab is the single most expensive “small” change a homeowner can request.
  • Material grade. Builder-grade cabinets and LVP at one end; custom cabinetry, tile shower, and impact glass at the other. That spread alone can be $20,000.
  • Permit scope. A full ADU with separate utility metering and its own address is a bigger permitting submission than a simple interior conversion.

Your written estimate will list demo, framing, rough-in, finishes, and the permit line item separately, with no change orders unless you change the scope. What usually sits outside the number: the roof work if the garage roof is already at the end of its life, and any drive work if the conversion eliminates parking. Homeowners often pair this with Concrete Driveways & Concrete Work in Sunrise Manor to regain a parking pad in front, or with Asphalt Driveways & Resurfacing in Sunrise Manor when the existing apron is shot.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Sunrise Manor Specifically Does to This Build

Here’s the fact that changes everything about a conversion here: Sunrise Manor is an unincorporated Clark County township, not a city. That means your permits, plan review, and inspections all run through Clark County rather than a municipal building department, and the review calendar and submittal package reflect that. Plan for it in your schedule.

Then there’s the housing stock. Most of the 89110 garages we open were built during the postwar eastward boom – single-story stucco on wood frame, slab-on-grade, flat or low-pitch roofs behind parapets. That combination matters for a conversion in two ways. First, wood framing that’s spent 50-plus years in 105°F summers dries and cracks, so we inspect studs before we build on them. Second, the parapet rooflines that define these tract streets hide years of ponding water and sun-baked coating failures, so the garage ceiling is often wetter than it looks from the driveway. We check it before drywall, not after.

Monsoon season is the other factor. Flash flooding across the flat valley means the graded approach to the new man door has to shed water away from the unit, not toward it. And wind matters: on exposed east-valley lots, the door assembly is the weak point. Wind-rated or impact-rated doors and properly anchored tracks are worth pricing early.

This work is part of a wider scope we cover on our Home Additions & ADU in Sunrise Manor page, and you can see the full service range on our Home Additions & ADU hub. We cover the whole of Sunrise Manor, including 89110, and our technicians bring up to 12 years of experience to each job.

Serving Sunrise Manor, NV – Our Local Coverage Area

We serve Sunrise Manor and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – Garage Conversion ADU in Sunrise Manor

A remodeled hall bathroom with patterned floor tile and painted walls

Get a Free Estimate on Your Sunrise Manor Garage Conversion ADU

Call (844) 320-6757 for a free on-site estimate. We’ll walk your garage, check the framing and the roof plane above it, confirm whether your drain location allows a no-move layout, and hand you a written line-item quote with the permit and inspection costs spelled out. A live person answers, day or night. No pressure on the call – you’ll leave with a real number and a real schedule.

Written by the team at Groundwork Construction Co.

Why Sunrise Manor Chooses Groundwork Construction Co. of Henderson

We set the standard for garage conversion ADU in Sunrise Manor.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Sunrise Manor

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Sunrise Manor Customers Say

Trusted by homeowners across Sunrise Manor and surrounding areas.

★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
New double-hung windows in a dining roomA new front yard fence with a matching gateA new curved paver walkway to the front porchA galley kitchen opened up to the dining room with a new peninsulaA walk-in shower with large-format tile and a built-in nicheA standing-seam metal roof over a covered porch

More services in Sunrise Manor

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Henderson

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Henderson team

A local vetted partner works across Henderson and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Garage Conversion ADU in Sunrise Manor?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Sunrise Manor.

(844) 320-6757

Request a Free Estimate in Sunrise Manor

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch