A Groundwork company - serving Henderson, NV
A new rear addition with a vaulted beamed ceiling and tall windows
New Detached ADU · Summerlin, NV

New Detached ADU in Summerlin - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Henderson
A second-story addition that matches the existing roofline
A remodeled family room with new windows and a window seat
New architectural shingles with a clean valley
A new casement window over a kitchen sink
A new white vinyl privacy fence with a double gate
New painted shaker cabinets with an organized deep drawer
A remodeled hall bathroom with patterned floor tile and painted walls
A remodeled kitchen with a waterfall island and wood cabinets
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

New Detached ADU in Summerlin: What It Takes and What It Costs

A detached ADU in Summerlin runs $45,000 – $130,000 depending on size, finish level and how much site work your lot needs. Most stand-alone units here are permitted and built out over roughly six to ten months, and the HOA and architectural review often eats the first six to ten weeks of that clock. Call (844) 320-6757 and we’ll walk your lot, check your community’s design rules, and put a written number in front of you.

Call (844) 320-6757

How a New Detached ADU Gets Built, Stage by Stage

A finished backyard cottage with a small covered porch

Detached builds move through a fixed sequence. What changes is how long each stage sits in review, and that’s where the surprises usually live. Here’s the real order of operations.

Stage 1: Site visit, survey and ARB package (weeks 1 – 3)

We start on the ground, not at a drafting table. On day one we walk the lot, measure setbacks, check where your sewer lateral and electrical service actually run, and see how much caliche sits between the surface and a footing. You decide the unit’s footprint and where it sits relative to your main house. Then we assemble the architectural submission for your community association, because in Summerlin that package goes in before anything else moves.

Stage 2: Architectural review and permits (weeks 3 – 10)

Your ARB reviews the plans against the community’s design standards: roof pitch, siding material, paint colors, window style, and how visible the unit is from the street and neighboring lots. We revise to their comments and resubmit until it’s approved, then file the building permit with the city. You sign off on the final plan set here. This is the stage homeowners most underestimate, and it’s the one we won’t rush, because building without approval is how you end up tearing something back out.

Stage 3: Site prep, excavation and utilities (weeks 10 – 14)

This is where the west-side desert ground makes itself known. Caliche is cemented calcium carbonate, and on Summerlin lots it has to be broken with equipment rather than dug with a trencher. We excavate for the footing, run the electrical and water lines from the main house, tie in the sewer, and rough in for future low-voltage needs. You make utility-disconnect decisions with us in advance so no one loses power or water for a full day.

Stage 4: Foundation, framing and exterior (weeks 14 – 26)

Slab or stem-wall goes in, framing follows, then the exterior skin goes on to match the approved look. Stucco, roofing and sealants all get worked in early-morning shifts because 110°F-plus summer afternoons cure them badly. You choose finishes, cabinets and fixtures during this window, and we lock orders so nothing stalls in a supply chain. Inspections happen at framing, rough-in and sheathing before we close walls.

Stage 5: Interior finishes and final walkthrough (weeks 26 – 40)

Insulation, drywall, plumbing trim, electrical devices, flooring, cabinets and paint go in, then final inspection, then a detailed walkthrough with you. Every item on your punch list gets addressed before we hand over keys. Trades are background-checked and uniformed, so you know who’s on your property.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices You’ll Actually Make on a Detached ADU

Detached units give you more freedom than a garage conversion, and that means more decisions. Here’s what genuinely changes the outcome.

  • Build method: site-built vs. prefab. Site-built gives you an exact match to your main house and total layout freedom. Panelized and prefab options from names like Mighty Buildings or Plant Prefab can shorten the framing stage, but their rigid dimensions may not fit a tight lot or your ARB’s exterior expectations. We’ll tell you which makes sense for your specific parcel.
  • Footprint and ceiling height. A 500-sq-ft studio with 8-ft ceilings is the budget anchor. Stepping to 750 – 900 sq ft with 9-ft ceilings adds real construction cost, but it’s what makes a unit feel like a house instead of a box, and it’s often worth it if family will live there long term.
  • Exterior skin. Stucco matches most Summerlin tract homes and is the safe ARB choice. James Hardie fiber-cement siding holds up to sun better on some exposures but may require color and texture submissions that go beyond what your HOA already approves.
  • Kitchen and bath level. A basic kitchenette versus a full kitchen with KraftMaid cabinets and a full bath with Kohler fixtures moves the number by tens of thousands. Decide early whether the unit is for rental income or parents, because that changes the answer.
  • Energy strategy. High-SEER HVAC, reflective roofing and shade from existing trees all matter against valley heat. Owners who overspend here usually save on electric bills within the first few summers.

What a New Detached ADU Costs in Summerlin, NV

A framer checking new wall framing on a home addition

Plan on $45,000 – $130,000 for a detached ADU in Summerlin. The low end is a modest studio; the high end is a full two-bedroom with upgraded finishes and tricky site work. Every quote is written line by line with fixed pricing, and the number you sign is the number you pay.

What pushes a unit from one end of the range to the other:

  • Size and layout complexity: every additional square foot carries framing, drywall, roofing and mechanical load.
  • Caliche excavation: the more rock below grade, the more breaking, hauling and time. This is why a flat, cleared lot and one with hidden rock can price differently.
  • Utility runs: distance from your main panel and sewer line to the unit drives trenching and wire cost.
  • Finish level: cabinetry, tile, fixtures and flooring grade swing the number fast.
  • Permit and ARB scope: additional review rounds or structural changes cost time and money.

A written estimate from us includes labor, materials, permits, inspections and haul-away. It typically doesn’t include HOA fees or optional landscaping around the finished unit.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

How Summerlin’s Rules and Ground Change This Build

Summerlin is a master-planned community on the valley’s west edge, and that fact shapes this job more than any single code. Nearly every neighborhood here is HOA-governed, so the architectural review comes before the building permit. That means your unit’s roof pitch, siding, paint color and window style must conform to the community standards set by the developer, and we submit a complete package that anticipates their concerns. It’s the same standard-keeping logic you’ll find in most Summerlin construction, whether it’s an ADU or a new driveway visible from the street.

Below grade, the caliche layer is the real driver. On west-side lots it must be broken, not dug, and that affects every trench for footing, plumbing and electrical. Monsoon-season flash flooding and desert soils that drain poorly mean grading and drainage around the new unit need real attention, not a token swale. Contractors who don’t plan for it come back for rework, and we don’t.

Most of what we build here is against tract homes from the 1990s forward, not renovation of old stock. When the site is part of a full Home Additions & ADU in Summerlin scope, we coordinate the unit with existing grading, drainage and utility trenches. If you’re planning a wider property upgrade, our Home Additions & ADU service covers the pieces this page doesn’t. We serve all of Summerlin, and homeowners often pair a detached build with a paver driveway in Summerlin to give the new unit its own access and finished look.

Serving Summerlin, NV – Our Local Coverage Area

We serve Summerlin and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – New Detached ADU in Summerlin

A remodeled primary bathroom with a soaking tub and walk-in shower

Get a Real Number on Your Detached Unit

Call (844) 320-6757 to schedule a free on-site estimate for a new detached ADU in Summerlin. We’ll walk the lot, check your community’s design standards, and put a written line-item price in front of you. A live person answers around the clock, and the number you see is the number you pay.

Written by the team at Groundwork Construction Co.

Why Summerlin Chooses Groundwork Construction Co. of Henderson

We set the standard for new detached ADU in Summerlin.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Summerlin

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Summerlin Customers Say

Trusted by homeowners across Summerlin and surrounding areas.

★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new clay tile roofNew double-hung windows in a dining roomA new front yard fence with a matching gateA new paver pool deckAn open kitchen and dining area after a remodelA freestanding soaking tub in a remodeled primary bathroom

More services in Summerlin

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Henderson

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Henderson team

A local vetted partner works across Henderson and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in Summerlin?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Summerlin.

(844) 320-6757

Request a Free Estimate in Summerlin

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch