







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Home Additions & ADU Across Whitney
An addition or ADU here rarely fails on the framing. It fails on paperwork and grade. Whitney is unincorporated Clark County, so your plans land at the county building department, not a city counter, and the Pittman Wash flood corridor can pull drainage review into a project that would sail through in Henderson. We know that path. Our technicians have up to 12 years of experience, we pull permits and pass inspections, and every project is backed by our 730-Day Done Right Promise. Call (844) 320-6757 to schedule your free estimate.
Why Groundwork Construction Co. of Henderson Is Whitney’s Preferred Home Additions & ADU Company

Whitney gets treated like a leftover between Las Vegas and Henderson, and the bids show it. We quote it as its own market: acreage lots, older tract homes off Boulder Highway, and county permitting that changes the schedule before a shovel touches dirt. Homeowners in the 89122 ZIP call us because we hand them a written line-item scope with allowances spelled out, not a lump sum that grows after framing.
Pricing is transparent from the first visit. The number you see on the estimate is the number you pay, and change orders only happen when you sign one. Live people answer our phones 24/7, so a plan-review question doesn’t sit until Monday. If the work is off, the 730-Day Done Right Promise covers it. If it’s not done right, we make it right.
We serve Whitney as part of our Home Additions & ADU in Whitney coverage, working alongside the independent local professionals who build on site. Background-checked, uniformed technicians handle every project, and we pair premium materials from brands like Boral and Atlas with the long-horizon guarantee so the build still holds up a decade from now.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Home Additions & ADU Services in Whitney
ADU Design & Permitting
Design is where Whitney projects either move or stall. Because the county reviews the plans, setback calculations, septic and well clearances, and Pittman Wash drainage all get checked before approval. We handle the drawing set and the submittal so you aren’t the one chasing corrections at the county counter.

Garage Conversion ADU
A typical garage conversion in Whitney’s older tract homes runs into original stucco-over-wood-frame walls, low ceilings, and garages that were never insulated for living space. We assess the slab, run the plumbing and electrical to code, and add proper ventilation before any drywall goes up. It’s the lowest-cost route to a rentable unit, and the county permit keeps it legal for resale.

New Detached ADU
Truth is, most Whitney ADUs start with a grading problem. The open ground doesn’t drain away from the slab, and monsoon runoff from the Pittman Wash corridor can pool against a new foundation. So we re-grade the site first, verify septic and well setbacks before any rough-in, then build the detached unit from foundation to finish line. On a typical Whitney lot, a qualified general contractor will schedule county inspection sign-off at each phase, because a permit is a third-party inspector confirming the work in your walls before they close.

Junior ADU & Interior Conversion
A junior ADU is the smallest, quickest addition you can make to an existing Whitney home, usually carved out of a bedroom suite or unused den with its own entrance and kitchenette. It still triggers county permitting, so we scope the walls, rough-ins, and egress before you commit. Room additions and second-story additions follow the same path when the lot has room to build up instead of out.
Trusted Brands We Service in Whitney
We don’t stock parts, and we don’t claim to. What we do is build with a curated set of brands we trust: Boral for masonry and trim where the design calls for it, Atlas roofing underlayment and shingles on the covered portions of a new addition, and Tamko on re-roof tie-ins. PGT matters when an addition adds a window wall or sliding door facing the summer sun. Those brand choices get written into the estimate so you know what’s going into the walls. Turnaround on material selection is quick because the spec is settled at the design consult.
See the difference
Before
After
Before
After
Before
AfterCommon Home Additions & ADU Problems We See in Whitney Homes
- Permits filed at the wrong counter. Homeowners used to Henderson or Las Vegas municipal review file at the wrong department and lose weeks to plan resubmittal. We file through Clark County from the start.
- Drainage ignored until inspection. Grading that lets Pittman Wash runoff pool against a new slab or septic field fails review and forces rework. We address grade before foundation.
- Aging stucco and low ceilings in older tract homes. Whitney’s mid-century to 1990s housing stock has original flat roofs and uninsulated garages that need reinforcement before a conversion.
- Scope drift on long material hauls. Without written allowances and change orders, the draw schedule and final price drift far from the original scope. We lock both into the contract.
Pricing for Home Additions & ADU in Whitney, NV
Honest numbers, Whitney market: a home addition runs $45,000 – $130,000, ADU construction runs $90,000 – $220,000, and a garage conversion runs $30,000 – $80,000. What moves you inside those ranges is real. Acreage site prep for grading and drainage adds cost. Septic and well setbacks that force re-routing add cost. Long equipment access on an open lot adds cost. County plan review adds time. We put every line into a written quote with allowances attached, so the number you see is the number you pay. Our 0% financing for 18 months and $1,000 off projects over $10,000 help on larger builds. Call (844) 320-6757 for a free estimate.
| Project Type | Whitney Price Range |
|---|---|
| Home Addition | $45,000 – $130,000 |
| ADU Construction | $90,000 – $220,000 |
| Garage Conversion | $30,000 – $80,000 |
We Also Serve Cities Near Whitney
If you’re just outside the unincorporated boundary, we still serve you. That includes Sunrise Manor, Winchester, Paradise, and Las Vegas. Same process, same 730-Day Done Right Promise, same written pricing. Call us and we’ll confirm your address on the first conversation.
Serving Whitney, NV – Our Local Coverage Area
We serve Whitney and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Home Additions & ADU in Whitney

Clark County issues the permit, because Whitney is unincorporated and has no city building department of its own. That changes everything about scheduling: plan review, inspection timing, and who signs off at each phase go through the county, not a Henderson or Las Vegas counter. Filing at the wrong counter stalls weeks of review. Call (844) 320-6757 for an exact quote; estimates are free.
Yes. The flood-control and drainage rules for the Pittman Wash corridor cross the area, and a detached ADU on a lot near that corridor triggers drainage review most nearby city lots never face. We verify the floodplain position and grade before siting the unit. Call (844) 320-6757 to schedule your free estimate.
They can push the buildable area on your lot and force re-routing of plumbing, which adds cost before a single wall goes up. We verify septic and well clearances during the site visit, then write the setbacks into the scope so the price doesn’t drift after rough-in. Call (844) 320-6757 for a real quote on your lot.
Because concrete trucks, excavators, and material deliveries have further to travel and often contend with the same Boulder Highway traffic corridor used for staging. Equipment access on an open lot sometimes needs a temporary drive or grading to reach the build site. We price both into the allowance upfront. Call (844) 320-6757 for a written estimate.
It means working around original stucco-over-wood-frame construction, uninsulated walls, and low ceilings in homes built from the mid-century through the 1990s. We assess the slab, run plumbing and electrical to code, add ventilation, and pass county inspection before drywall closes it up. Call (844) 320-6757 to schedule a free design consult.
Adding on in Whitney means more than pouring a slab. It means knowing where the county counter is, how the wash drains, and what your lot will actually carry. Call Groundwork Construction Co. of Henderson at (844) 320-6757 for a free estimate on your addition or ADU. Live people answer around the clock.
Written by the team at Groundwork Construction Co.












