A Groundwork company - serving Henderson, NV
A new rear addition with a vaulted beamed ceiling and tall windows
ADU Site Prep & Utilities · Whitney, NV

ADU Site Prep & Utilities in Whitney - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Henderson
A second-story addition that matches the existing roofline
A remodeled family room with new windows and a window seat
A new concrete driveway with a paver border
A stone counter, tile backsplash and open shelf after a kitchen remodel
A remodeled hall bathroom with subway tile and a floating vanity
New architectural shingles with a clean valley
A new casement window over a kitchen sink
A new white vinyl privacy fence with a double gate
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Site Prep & Utilities in Whitney, NV

Site prep and utilities for an ADU in Whitney usually runs $45,000 – $130,000 depending on how much trenching, grading, and service work the lot needs. The job covers everything that happens before a single wall goes up: clearing and grading the pad, running water, sewer, and electrical to the structure, coordinating gas, and getting the site through Clark County inspections. Plan on six to twelve weeks for this phase alone. For a written, line-item scope on your lot in the 89122 ZIP, call (844) 320-6757.

Call (844) 320-6757

How site prep and utility work actually runs, stage by stage

A garage converted into a guest room and home office

This is the phase homeowners underestimate most. Here’s the real sequence we follow, and what you’ll be deciding along the way.

  • Stage 1 – Site survey and utility locate (days 1 – 3). We walk the lot, mark existing buried lines, and confirm where the pad sits relative to setbacks and the Pittman Wash drainage corridor if your property is anywhere near it. You decide the final placement and the pad elevation at this stage.
  • Stage 2 – Clearing and rough grading (days 3 – 7). Brush, old fence, and any slab come out. We cut and fill to get a level, well-drained pad. In Whitney’s summer heat this grading happens early morning before the ground bakes hard. You’ll want to confirm the pad meets the finished floor height of the ADU plan before we compact.
  • Stage 3 – Trenching and underground utilities (days 7 – 18). Water, sewer (or septic connection), electrical conduit, and gas lines get trenched and laid. Depths and separations have to meet code, and the trench is inspected before backfill. This is the stage that drags longest when the run to a main is far or a wall needs cutting.
  • Stage 4 – Inspections and backfill (days 18 – 25). Clark County inspects the underground work, then we backfill and compact. You don’t need to be on-site for this, but we send photos.
  • Stage 5 – Final grade, drainage, and utility connections (days 25 – 40+). We finish the grade so water sheds away from the future structure, tie in the meter connections, and stage the site for the build. This is where siding drainage, swales, and the utility stub-ups all get locked in.

Total realistic window for a straightforward lot: four to six weeks. Sloped lots, long utility runs, or an older property that needs service upgrades push it to eight or more. Our home additions & adu service handles the full sequence, so you’re not juggling a site prep contractor and a builder who blame each other when the trench and the foundation don’t line up.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The choices you’ll actually make on site prep and utilities

Most of the cost variance comes down to a handful of concrete decisions. Here’s what you’re picking between, with the honest trade-offs.

  • Water and sewer tie-in vs. septic. Connecting to a municipal sewer main is the standard route in Whitney’s tract neighborhoods; a property with acreage or an edge-of-town location may need a septic system instead, which adds real money and inspection scope. Tie-in is cheaper upfront but depends on a nearby main.
  • Underground electrical conduit sizing. Run 1″ PVC conduit for a small ADU, up to 1.5″ – 2″ if you’re feeding a larger structure or future subpanel. Going undersized now forces a re-dig later. We size to the panel the ADU plan calls for.
  • Gas vs. all-electric. A gas line run is a modest trench addition and suits a stove or tankless water heater; all-electric skips the gas work but may need a heavier service and panel upgrade. In Whitney’s heat, a heat-pump water heater on electric holds efficiency well.
  • Pad construction: slab-on-grade vs. a raised engineered pad. Slab-on-grade is the common choice and the cheaper one; a raised pad handles a graded lot and protects against the monsoon drainage that funnels down toward the Pittman Wash channel.
  • Drainage and grade detail. A simple gravity swale costs less; a French drain or dry well system costs more but manages sheet flow from a heavy storm. For sloped lots near the wash, this isn’t optional-adjacent.

If you’re also reworking the approach to the ADU, homeowners often pair this with Concrete Driveways & Concrete Work in Whitney or, on a finer finish, Paver Driveways in Whitney so the access path gets done in the same site pass.

What ADU site prep and utilities cost in Whitney, NV

A framer checking new wall framing on a home addition

For a Whitney ADU, site prep and utility work typically lands between $45,000 and $130,000. What moves you toward the low end versus the high end:

  • Lot size and grade. A flat, cleared lot needs less cut-and-fill and less retaining work. A graded or rocky lot pushes the grading line up substantially.
  • Distance to utilities. Short runs to a nearby main and meter keep trenching and materials down. A long run to sewer or a remote electrical service adds trench length, conduit, and inspection scope.
  • Existing conditions. Aging stucco-over-frame homes along Boulder Highway often have undersized panels or old service lines that need upgrading before the ADU ties in. That upgrade is real cost.
  • Utility decisions. All-electric with a panel upgrade versus gas tie-in, and septic versus sewer, swing the number by thousands depending on which you choose.
  • Drainage and permit scope. Drainage work coordinated with the Pittman Wash corridor and any Clark County plan-review requirements add to the total.

A written estimate itemizes grading, trenching, materials, connections, inspections, and drainage as separate lines so you can see exactly what each costs. What sits outside the site-prep line: the ADU structure itself, interior finishes, landscaping beyond final grade, and any plan redesign. Call (844) 320-6757 for a line-item quote on your property – estimates are free, and we price with no change-order surprises.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Whitney’s own building reality means for your site prep

Whitney is unincorporated Clark County, and that single fact changes the paperwork. There’s no city building department here, so a permit and inspection for your ADU site work runs through Clark County rather than a Las Vegas or Henderson counter. Contractors used to municipal review have to file in the county system, and that affects plan-review scheduling and who signs off on the underground utilities and final grade. The housing stock matters too: the mid-century to 1990s single-family tract homes that make up most of Whitney – many with original service lines and block-wall fencing – are exactly where we find undersized electrical panels and aging water connections that need addressing before an ADU ties in. Add the Mojave heat, with summer highs over 105°F, and the flash flooding that moves along the Pittman Wash drainage, and grading and drainage stop being afterthoughts. We coordinate around the Boulder Highway corridor for staging and deliveries, because that’s the realistic route in and out of most of these lots. We cover all of it through our Whitney service area.

Serving Whitney, NV – Our Local Coverage Area

We serve Whitney and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked – ADU Site Prep & Utilities in Whitney

A new curved paver walkway to the front porch

Get a free site-prep estimate for your Whitney ADU

Tell us about your lot in Whitney and we’ll walk it, check the grade, trace the utility runs, and hand you a written, line-item estimate that separates grading, trenching, connections, and drainage. No pressure and no guesswork. Call (844) 320-6757 to schedule your free estimate – a live person answers any time. It’s part of the full scope in Home Additions & ADU in Whitney, and we’ll tell you straight what your property needs before anything gets dug.

Written by the team at Groundwork Construction Co.

Why Whitney Chooses Groundwork Construction Co. of Henderson

We set the standard for ADU site prep & utilities in Whitney.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Whitney

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Whitney Customers Say

Trusted by homeowners across Whitney and surrounding areas.

★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new front entry door with glass sidelightsA new black aluminum pool fence with a gateA galley kitchen opened up to the dining room with a new peninsulaA walk-in shower with large-format tile and a built-in nicheA standing-seam metal roof over a covered porchA new bay window with a cushioned seat

More services in Whitney

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Henderson

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Henderson team

A local vetted partner works across Henderson and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Site Prep & Utilities in Whitney?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Whitney.

(844) 320-6757

Request a Free Estimate in Whitney

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch