A Groundwork company - serving Henderson, NV
A new rear addition with a vaulted beamed ceiling and tall windows
ADU Design & Permitting · Boulder City, NV

ADU Design & Permitting in Boulder City - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Henderson
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
A new white vinyl privacy fence with a double gate
New painted shaker cabinets with an organized deep drawer
A remodeled hall bathroom with patterned floor tile and painted walls
A remodeled kitchen with a waterfall island and wood cabinets
A wood double vanity with two mirrors after a bathroom remodel
A new roof with clean valleys and new flashing
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Design & Permitting in Boulder City, NV: What It Takes and What It Costs

ADU Design & Permitting in Boulder City runs $45,000 – $130,000 for the full design-through-permit scope, and the design and permitting phase alone usually takes 3 – 6 months before a shovel hits the ground. Most of that time is spent on survey, drawings, and Historic District or city review, not on construction. Call (844) 320-6757 to schedule a free on-site estimate and get a written, line-item scope for your lot.

Call (844) 320-6757

How ADU Design & Permitting Actually Runs, Stage by Stage

A finished backyard cottage with a small covered porch

Design and permitting is a sequence, and the sequence matters more here than in most towns because Boulder City lots are tight and a good number of them sit inside the Historic District. Here’s what the work looks like from day one.

Stage 1: Site visit and feasibility (week 1)

We walk the lot, measure setbacks, check where the sewer lateral and water line enter the house, and confirm what the parcel can actually hold. On a Boulder City infill lot, the answer is often “smaller than you hoped” because the townsite was platted in the 1930s for cottages, not accessory units. You decide at this stage whether you’re pursuing a detached unit or converting existing space. This is also where we flag whether the property touches Historic District boundaries.

Stage 2: Survey and boundary confirmation (weeks 2 – 4)

A licensed surveyor confirms property lines, easements, and existing utilities. On tight Boulder City parcels this is not a formality; older lots sometimes have fences or sheds sitting a foot over the line, and that has to be resolved before drawings are worth anything. You decide nothing here except to authorize the survey. We handle the coordination.

Stage 3: Schematic design and your sign-off (weeks 4 – 8)

Drawings take shape: floor plan, elevations, roof pitch, window placement, and how the unit meets the ground. You make your big decisions here: unit size, one bedroom or a studio, kitchenette layout, bathroom configuration, and exterior finish. In Boulder City, exterior materials and colors carry extra weight if the parcel is under historic-commission review, so we bring finish options early rather than late.

Stage 4: Permit submission and plan review (weeks 8 – 20)

We submit the drawing set, structural calcs, energy documentation, and site plan to the city. Plan review runs a few weeks for a clean submittal and longer if the parcel requires Historic District design review, since those meetings are scheduled, not rolling. You’ll be asked to sign the application and, on historic parcels, may need to attend a hearing. This is the stage that most often stretches the schedule, and it’s the one homeowners underestimate.

Stage 5: Permit issuance and construction handoff (week 20 and beyond)

Once the permit is issued, the drawings become the build documents and construction can start. You decide at this point whether to proceed immediately or phase the build. We hand off a complete, approved permit set and a construction schedule with inspection milestones marked.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Options You’ll Choose Between in Boulder City

Design and permitting decisions come down to a handful of real trade-offs. These are the ones that matter for a Boulder City ADU:

  • Detached vs. attached unit. Detached freestanding buildings give privacy and separate utility runs, but on a tight Boulder City lot they eat yard and often force a smaller footprint. Attached units use existing walls and are usually cheaper to permit and build, though privacy drops.
  • Unit size. A studio under 500 sq ft keeps drawings and permit fees lean. A one-bedroom around 600 – 750 sq ft is the sweet spot for rental value. Every additional square foot raises design, structural, and permit cost.
  • Exterior finish. Stucco matches the Mission and Pueblo Revival cottages that dominate Boulder City and holds up to intense sun better than wood siding, but it’s a slower application and doesn’t suit every budget. Wood siding is cheaper up front and needs repainting more often in the Mojave heat.
  • Roof style. A low-slope or flat roof with membrane is simplest for a small unit. A pitched tile roof matches the historic housing stock but adds structural weight and cost.
  • Window system. In a high-heat, high-sun market, impact-rated and thermally efficient glass lowers cooling load and holds up to desert UV. Systems from manufacturers like CWS and ES Windows are the sort of spec we bring to the table when you want performance over the cheapest option.
  • Utility tie-in point. Tapping the existing main panel and sewer line is far cheaper than a new service. Where the unit sits relative to existing infrastructure drives cost more than most design choices.

What ADU Design & Permitting Costs in Boulder City, NV

A framer checking new wall framing on a home addition

For this scope, the number runs $45,000 – $130,000 depending on what’s included and how complex the lot is.

Line item Typical range
Survey and site analysis $1,200 – $3,000
Architectural drawings and structural design $6,000 – $18,000
Civil site plan and utility layout $1,500 – $4,500
Permit fees and plan review $2,000 – $8,000
Historic District design review (if applicable) $500 – $3,000
Full ADU scope with construction included $45,000 – $130,000

Four variables push a job toward the low or high end. Site constraints matter most: a tight, sloping, or line-ambiguous lot needs more survey and civil work. Historic District status adds a review layer and possible finish revisions. Unit size and configuration drive both drawings and structural calc. Existing condition around utility tie-in points (an older panel, a compromised sewer lateral) can add real dollars. Permit scope is the last lever; a phased submission that separates design from construction can lower up-front cost but risks re-review.

A written estimate should specify exactly which drawings, calculations, submissions, and review steps are included, and which are not, such as furniture layouts, landscape plans, or construction itself. Call (844) 320-6757 for a free estimate; the number you see on the quote is the number you pay, with no surprise change orders.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Boulder City Homes Specifically Do to This Job

Boulder City is one of the only places in Nevada where new construction is boxed in by federally owned land; roughly 97% of the surrounding land is controlled by the Bureau of Reclamation and National Park Service. That means almost every project here is renovation, addition, or infill inside a mostly built-out 1930s planned townsite protected by Historic District design review. We can’t pull a standard suburban permit and go; window choices, exterior finishes, even paint colors on the Boulder Dam-era cottages can require historic-commission sign-off. Add the Mojave climate, 100°F-plus summers that beat up stucco and roofing, and flash-flood risk in the surrounding washes that makes site drainage part of the design. On a 1930s cottage near the Historic District core, that combo shapes the ADU drawings from day one. Our technicians have up to 12 years of experience reading these parcels. This project often pairs with exterior work; many homeowners layer in Paver Driveways in Boulder City or a Chain Link Fence in Boulder City to define the new unit’s yard. It’s part of full Home Additions & ADU in Boulder City work when the scope widens. See more of our Home Additions & ADU service, and check what we cover across Boulder City.

Serving Boulder City, NV – Our Local Coverage Area

We serve Boulder City and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked Questions

A new wood side gate with black hardware

Get a Free ADU Design & Permitting Estimate in Boulder City

Call (844) 320-6757 for a free on-site estimate for ADU Design & Permitting in Boulder City. On that call you’ll get a walkthrough of your lot’s real options, a written scope, and a clear timeline so you know exactly what’s included and what comes next. Live person answers 24/7, no voicemail. No-hassle upfront pricing. Financing options available.

Written by the team at Groundwork Construction Co. of Henderson.

Why Boulder City Chooses Groundwork Construction Co. of Henderson

We set the standard for ADU design & permitting in Boulder City.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Boulder City

Getting your ADU design & permitting project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU design & permitting project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU design & permitting pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Boulder City Customers Say

Trusted by homeowners across Boulder City and surrounding areas.

★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A stone counter, tile backsplash and open shelf after a kitchen remodelA remodeled primary bathroom with a soaking tub and walk-in showerA new clay tile roofNew double-hung windows in a dining roomA new front yard fence with a matching gateA new paver pool deck

More services in Boulder City

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Henderson

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Henderson team

A local vetted partner works across Henderson and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Design & Permitting in Boulder City?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Boulder City.

(844) 320-6757

Request a Free Estimate in Boulder City

Tell us about your ADU design & permitting needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch