A Groundwork company - serving Henderson, NV
A new rear addition with a vaulted beamed ceiling and tall windows
New Detached ADU · Whitney, NV

New Detached ADU in Whitney - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Henderson
A second-story addition that matches the existing roofline
A remodeled family room with new windows and a window seat
A new multi-panel patio door opening a kitchen to the patio
A new stained cedar privacy fence
A new paver patio with a seat wall and fire pit
A remodeled primary bathroom with a soaking tub and walk-in shower
A new clay tile roof
New double-hung windows in a dining room
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

What a New Detached ADU in Whitney, NV Involves

A new detached ADU in Whitney, NV is a separate, self-contained living unit built on its own footprint – typically 500 to 1,000 square feet with a full kitchen, bathroom, sleeping area, and its own entrance – and most projects run $45,000 to $130,000 depending on size and finish level. Plan review through Clark County, site work, and construction usually take five to eight months from first deposit to final inspection. Call (844) 320-6757 and we’ll walk your lot and give you a real number.

Call (844) 320-6757

Key takeaways

  • Whitney sits in unincorporated Clark County, so your ADU gets permitted and inspected by the County, not a city building department.
  • Lot access, utility runs, and drainage near the Pittman Wash corridor drive more of the cost here than square footage alone.
  • Budget $45,000 – $130,000 for the structure and finish; heavy site work and long utility trenches push toward the top.
  • Every ADU we build is covered by our 730-Day Done Right Promise.

How we build a detached ADU, stage by stage

A finished backyard cottage with a small covered porch

This is a ground-up build, not a conversion, so the sequence matters. Here’s what actually happens and when you make decisions.

Stage 1: Lot walk and feasibility (week 1)

We look at where the unit can sit, how a truck and concrete pump reach it, and where power, water, and sewer or septic actually connect. On Whitney lots, setback and lot coverage are the first things we check against County rules. You decide the rough footprint and placement. This is also when we confirm whether your drainage needs work before anything else – a lot that ponds during monsoon season has to be graded before a slab goes down.

Stage 2: Design and County plan review (weeks 2 – 10)

Drawings, structural calcs, and the permit submittal go to Clark County. Review timing varies, but plan check on an ADU usually runs several weeks. You decide the floor plan, exterior finish, roof style, and whether the kitchen is a full range-and-fridge setup or a compact kitchenette. Changes here are cheap. Changes after framing are not.

Stage 3: Site prep and foundation (weeks 10 – 15)

Trenching for utilities, grading, and the slab or stem-wall foundation. In Whitney’s heat, concrete placement happens early morning and gets cured with extra care, because 105°F afternoons pull moisture out of a slab fast. You’ll sign off on utility tie-in locations. We coordinate deliveries and staging around the Boulder Highway corridor so we’re not blocking your driveway for days.

Stage 4: Framing, systems, and rough inspections (weeks 15 – 24)

Walls go up, then roofing, then electrical, plumbing, and HVAC rough-in, with County inspections at each phase. You pick rough-in locations now – outlet placement, fixture spots, mini-split head position – because after drywall they’re fixed. Stucco and exterior finishes go on and get protected through curing.

Stage 5: Finishes and final inspection (weeks 24 – 32)

Cabinets, counters, flooring, fixtures, paint, and trim. You choose finishes at the start of this stage from our material partners. Then the County does its final inspection, and you get a walkthrough with us before we hand over keys.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The options you’ll choose between

  • Stick-built on site vs. a prefab module. Site-built gives you a custom plan and matches your house exactly; it takes longer. Prefab options from makers like Plant Prefab or Mighty Buildings can compress construction time and come with engineered systems, but you’re working within their plan catalog and factory lead times, and site work still happens on your lot.
  • Roof style. A low-slope or flat roof matches much of Whitney’s older housing stock and costs less; a pitched roof sheds heat and rain better and lasts longer but adds framing and material cost.
  • Exterior finish. Stucco is the local norm and handles desert sun well; siding or panel systems cost more but go up faster and take less curing time.
  • Cooling. A ductless mini-split is the practical pick for a 600-square-foot unit – efficient, zoned, and cheaper to install than full ductwork. A full ducted system only makes sense if you’re tying into the main house.
  • Kitchen level. Full range, fridge, and sink for rental income, or a kitchenette for family use. This single choice swings the budget by thousands.
  • Tuff Shed-style utility structures are worth considering only for storage additions, not living space – an ADU that gets permitted as habitable has to meet County code for structure, egress, and utilities.

What a New Detached ADU costs in Whitney, NV

A framer checking new wall framing on a home addition

Our lead range for a new detached ADU in Whitney is $45,000 – $130,000. That’s the number you should start with when you talk to any contractor, and here’s what moves it.

  • Size and finish level: A compact 500-square-foot unit with standard finishes lands near the low end; 900 – 1,000 square feet with upgraded kitchen and bath pushes toward the top.
  • Utility distance: The farther the unit sits from your main panel and sewer or water tie-in, the more trenching, conduit, and labor. A back-corner placement can add real money.
  • Site work and drainage: Grading, drainage correction near the Pittman Wash corridor, and hauling off excess soil are separate cost lines that vary lot to lot.
  • Structural and code scope: Engineered footings, tie-ins to existing utilities, and any accessibility requirements add cost.
  • Permit and inspection scope: Clark County fees, plan review, and inspection scheduling are part of the written estimate, not a surprise later.

A written line-item estimate from us includes design coordination, permit submittal, site prep, foundation, framing, systems, finishes, and final inspection. It typically does not include landscaping beyond rough grading, furniture, or appliances beyond what you spec. Upfront pricing, no surprises – the number you see is the number you pay.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Whitney homes specifically do to this job

Whitney is unincorporated Clark County, wedged between Las Vegas and Henderson, and it has no city building department. That means your ADU is permitted through Clark County, not a municipal counter – a distinction that shapes plan review timing and who signs off at inspection. Contractors used to filing in Henderson or Las Vegas often underestimate this, and projects stall waiting on the wrong submittal. We file with the County from the start.

Much of Whitney’s housing runs from mid-century to 1990s single-family tract homes, plus RV and boat storage lots strung along Boulder Highway. That mix means we frequently work lots where the original drainage was never designed for a second structure, and where monsoon-season flooding along the Pittman Wash corridor has to be planned around rather than ignored. The intense Mojave heat – summer highs routinely past 105°F – also shortens our exterior workday and demands careful curing on concrete and stucco, which we account for in scheduling. If your unit needs its own driveway or apron, homeowners often pair this with Concrete Driveways & Concrete Work in Whitney.

Serving Whitney, NV – Our Local Coverage Area

We serve Whitney and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked – New Detached ADU in Whitney

A new white vinyl privacy fence with a double gate

Get a real number on your ADU

Every Whitney ADU starts with a free on-site estimate. We walk the lot, confirm your drainage and utility situation, and give you a written line-item price – no vague ranges, no change-order games. Financing at 0% for 18 months is available, and projects over $10,000 get $1,000 off. Call (844) 320-6757 to schedule. You can also see the wider scope on our Home Additions & ADU service, and any project can start as part of a full Home Additions & ADU in Whitney plan. Homeowners near the golf course often pair this with Paver Driveways in Whitney for a finished approach to the unit. We also cover the rest of Whitney and nearby Sunrise Manor, Winchester, and Paradise.

Written by the team at Groundwork Construction Co.

Why Whitney Chooses Groundwork Construction Co. of Henderson

We set the standard for new detached ADU in Whitney.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Whitney

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Whitney Customers Say

Trusted by homeowners across Whitney and surrounding areas.

★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A galley kitchen opened up to the dining room with a new peninsulaA walk-in shower with large-format tile and a built-in nicheA standing-seam metal roof over a covered porchA new bay window with a cushioned seatNew painted shaker cabinets with an organized deep drawerA remodeled hall bathroom with patterned floor tile and painted walls

More services in Whitney

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Henderson

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Henderson team

A local vetted partner works across Henderson and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in Whitney?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Whitney.

(844) 320-6757

Request a Free Estimate in Whitney

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch