A Groundwork company - serving Henderson, NV
A new rear addition with a vaulted beamed ceiling and tall windows
ADU Site Prep & Utilities · North Las Vegas, NV

ADU Site Prep & Utilities in North Las Vegas - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Henderson
A second-story addition that matches the existing roofline
A remodeled family room with new windows and a window seat
A new paver pool deck
An open kitchen and dining area after a remodel
A freestanding soaking tub in a remodeled primary bathroom
A newly finished roof with a ridge vent and step flashing
A new front entry door with glass sidelights
A new black aluminum pool fence with a gate
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Site Prep & Utilities in North Las Vegas, NV: What It Involves and What It Costs

ADU site prep and utilities in North Las Vegas runs $45,000 – $130,000 for the sitework package that gets a detached unit ready to build and connected to city services. That covers excavation, grading, footings, the utility trench, water and sewer stubs, the electrical service and gas line, and the inspections that come with each one. Most jobs take six to ten weeks before the first wall goes up. Call Groundwork Construction Co. at (844) 320-6757 to schedule a free on-site estimate.

Call (844) 320-6757

Key takeaways:

  • Site prep and utilities are typically the first two months of an ADU build, and they set the budget for everything after.
  • Caliche is the single biggest cost swing in this city. Hard desert soil can add days of excavation before a footing is even dug.
  • Utility work is inspected in stages. You can’t pour or backfill until each stage passes.
  • Every project is covered by our 730-Day Done Right Promise, in writing.

How We Handle Site Prep and Utilities, Stage by Stage

A garage converted into a guest room and home office

This part of the project is the part nobody photographs. It’s also where a badly run job goes over budget before the first board is cut. Here’s the real sequence.

Stage 1: Site walk and utility locate (day 1 – 2)

We walk the lot with you, confirm the footprint off your approved plans, and call for utility locates. We also probe the soil in two or three spots to find out how much caliche we’re dealing with. You decide the final setback from the property line and the side of the lot the unit sits on. That decision locks in the trench path.

Stage 2: Excavation and grading (day 3 – 10, longer on caliche)

A crew cuts the pad and grades for drainage. On raw desert lots in North Las Vegas this is where the schedule flexes. Caliche can be hard enough to need a jackhammer or a specialty breaker rather than a standard excavator bucket. You’ll approve the pad elevation and the direction the lot drains. We grade away from the unit and the main house, always.

Stage 3: Footings and under-slab rough-in (day 10 – 21)

Footings go in first, and the under-slab plumbing and electrical conduit go in before the slab. Sanitary line, water service, electrical feeder, and low-voltage conduit all get placed and inspected, then the slab is poured. This is your last free window to add a hose bib, an outdoor outlet, or a data line without a change order.

Stage 4: Utility trench and connections (day 21 – 40)

We trench from the unit to the main house or the city connection points for water, sewer, gas, and power. If the meter needs a larger service panel, that happens here too. You decide on gas versus all-electric at this stage, and whether you want a separate meter for the ADU.

Stage 5: Inspections and backfill (day 40 – 60)

Each utility gets inspected before backfill. Once it passes we backfill, compact in lifts, and restore the surface. That restoration is where a lot of homeowners get surprised by other contractors. We pull permits and pass inspections as part of the job, and no change order shows up for a trench we already quoted.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices You’ll Actually Make on a North Las Vegas ADU Site

Site prep sounds like a single line item. It’s really five or six decisions, and each one has a trade-off worth understanding before you sign.

  • Excavation method. Standard digging is the baseline. Caliche may need breaking or a specialty attachment. Breaking costs more up front but avoids a failed footing inspection and a redo.
  • Grading and drainage plan. A simple slope-away plan is the cheapest and works on most flat lots. A swale or a French drain adds cost but handles the sheet flow monsoon storms push across graded ground, which is a real concern on open-edge lots in 89084 and 89085.
  • Electrical service size. Tapping the existing panel works only if there’s capacity for the ADU’s load. A dedicated subpanel or a separate meter costs more but keeps ADU usage cleanly separated from the main house.
  • Trench depth and conduit. Minimum-depth direct-burial conduit meets code. Going deeper and using rigid conduit costs more and handles ground movement better over time.
  • Plumbing material. Standard PVC drain lines are the norm. Cast iron is quieter under a slab and lasts longer, at a premium.
  • Surface restoration. Plain concrete over the trench is the practical default. Pavers or a finished hardscape cost more. Homeowners often pair this with Concrete Driveways & Concrete Work in North Las Vegas or Paver Driveways in North Las Vegas when the trench cuts through a driveway anyway.

What ADU Site Prep & Utilities Costs in North Las Vegas, NV

A framer checking new wall framing on a home addition

Plan on $45,000 – $130,000 for site prep and utilities on a detached unit in North Las Vegas. That’s the working range from jobs we’ve scoped here, and the low or high end usually comes down to five variables.

  • Footprint and unit size. A larger unit means more excavation, more concrete, and longer trench runs.
  • Soil condition. Caliche can add meaningful excavation cost. A lot that probes soft digs fast.
  • Distance to connections. The farther the unit sits from the main house and the street connections, the more trench, pipe, and wire.
  • Service upgrades. If the existing panel or water service can’t carry the ADU, that upgrade lands in this budget.
  • Permit and inspection scope. A larger sitework scope means more inspections and more time.

A written estimate from us breaks out excavation, grading, footings, each utility, the trench, restoration, and permits line by line. What’s typically outside the number: landscaping, fencing, and the ADU structure itself. The number you see is the number you pay, and our technicians have up to 12 years of experience on work like this.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What North Las Vegas Lots Specifically Do to This Job

North Las Vegas is still converting raw desert into subdivisions, and that changes site prep in ways it doesn’t in a built-out city. On lots in 89084 and 89085, footings often hit caliche, so we probe before we quote. Monsoon storms can send sheet flow across a freshly graded lot, so grading and drainage get real scrutiny from the city inspector here. That’s less of an issue in flatter, older urban cores.

The housing stock matters too. On the north side, post-2000 stucco-and-tile tract homes usually have clean, modern utility layouts, so tying in is straightforward. In the older core around 89030 and 89032, block homes built in the 1950s to ’70s often have undersized panels, aging water service, and orangeburg or aging sewer lines. Those retrofits are where scope climbs. Summer highs above 105°F also push pour schedules to early morning, so concrete goes in before the heat hits.

Site prep is only the front half of the project. The structure comes after, and the wider scope lives on our Home Additions & ADU in North Las Vegas page. We handle site prep as its own phase or as part of a full home additions & adu project from foundation to finish line, and we cover every neighborhood on the North Las Vegas service-area page.

Serving North Las Vegas, NV – Our Local Coverage Area

We serve North Las Vegas and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked: ADU Site Prep & Utilities in North Las Vegas

A new wood side gate with black hardware

Get a Free Estimate on ADU Site Prep & Utilities in North Las Vegas

Call (844) 320-6757 for a free on-site estimate on your ADU site prep and utilities in North Las Vegas. A live person answers, day or night. We’ll walk the lot, probe the soil, confirm the trench path, and hand you a written line-item quote with upfront pricing and no surprises. If it’s part of a bigger build, we’ll quote it alongside the rest. No-hassle pricing, permits pulled, inspections passed.

Written by the team at Groundwork Construction Co.

Why North Las Vegas Chooses Groundwork Construction Co. of Henderson

We set the standard for ADU site prep & utilities in North Las Vegas.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in North Las Vegas

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What North Las Vegas Customers Say

Trusted by homeowners across North Las Vegas and surrounding areas.

★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A remodeled hall bathroom with subway tile and a floating vanityNew architectural shingles with a clean valleyA new casement window over a kitchen sinkA new white vinyl privacy fence with a double gateNew painted shaker cabinets with an organized deep drawerA remodeled hall bathroom with patterned floor tile and painted walls

More services in North Las Vegas

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Henderson

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Henderson team

A local vetted partner works across Henderson and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Site Prep & Utilities in North Las Vegas?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in North Las Vegas.

(844) 320-6757

Request a Free Estimate in North Las Vegas

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch