A Groundwork company - serving Henderson, NV
A new rear addition with a vaulted beamed ceiling and tall windows
ADU Site Prep & Utilities · Sunrise Manor, NV

ADU Site Prep & Utilities in Sunrise Manor - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Henderson
A remodeled family room with new windows and a window seat
A garage converted into a guest room and home office
A stone counter, tile backsplash and open shelf after a kitchen remodel
A remodeled hall bathroom with subway tile and a floating vanity
New architectural shingles with a clean valley
A new casement window over a kitchen sink
A new white vinyl privacy fence with a double gate
New painted shaker cabinets with an organized deep drawer
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Site Prep & Utilities in Sunrise Manor: What It Takes, What It Costs

ADU site prep and utilities in Sunrise Manor typically runs $45,000 – $130,000 for the ground work, trenching, and service connections that come before a single panel goes up, and it takes roughly 4 – 9 weeks depending on how deep the utilities have to run and what the county requires at inspection. If your lot in the 89110 ZIP already has power, water, and a clear path to the sewer lateral, you’ll land near the low end. A long run, a new meter, or a detached casita set deep in the yard pushes it toward the top. Call (844) 320-6757 and we’ll walk your lot with you and put real numbers on it before you commit to anything.

Call (844) 320-6757

How We Sequence Site Prep and Utilities, Stage by Stage

A single-story rear room addition with tall windows and a new patio

The order matters more than the speed. Get the underground work wrong and you’re cutting fresh concrete six months later. Here’s how a typical Sunrise Manor job actually runs, from the first morning to the day the slab is ready for the ADU kit.

Stage 1: Site walk and utility locate (day 1)

We start by mapping what’s already underground. Water, sewer, gas, and any existing low-voltage get located and marked before a shovel touches dirt. You decide at this stage where the ADU footprint sits and where each service enters it. On slab-on-grade tract lots in Sunrise Manor, that decision is often driven by the sewer lateral’s depth and direction, not by where the casita looks best. Expect a half day for the locate and layout.

Stage 2: Demo, grading, and drainage (days 2 – 5)

Old patio concrete comes out, the pad gets graded to drain away from the house and the new structure, and we cut the trench runs for water, sewer, power, and gas. In this part of the valley, grading isn’t cosmetic. The flat ground means water sits where you leave it, and monsoon-season runoff finds every low spot. A full day of that window goes to getting positive slope and a clear path for stormwater before anything goes back in the trench.

Stage 3: Underground utility installation and inspection (days 5 – 12)

Sewer and water lines go in first at the right fall, then electrical conduit and gas. This is the stage where Clark County inspections happen, and where schedule slip is most common if the trench isn’t ready or the drawings don’t match what’s actually in the ground. You don’t have a decision to make here except one: whether to oversize the electrical conduit now for future capacity. We recommend it. Running a second conduit now costs a fraction of trenching again later.

Stage 4: Backfill, compaction, and slab prep (days 12 – 20)

Trenches get backfilled in lifts and compacted so the slab doesn’t settle and crack. We set forms, vapor barrier, and rebar or mesh, then call for the pre-pour inspection. This is the last easy moment to add a floor drain, a stub for an outdoor shower, or a dedicated circuit for a mini-split. After the pour, everything’s a demolition job.

Stage 5: Slab pour and utility stubs (days 20 – 30, weather depending)

Concrete goes down, cures, and we leave capped stubs and a labeled panel ready for the ADU’s own systems. If you’re going with a prefab unit like a Boxabl or a Plant Prefab model, this is the handoff point where their set crew takes over. If you’re building stick-frame behind a Mighty Buildings panelized shell, our crew carries the utilities up into the walls from here. Total working days run 4 – 6 weeks for the underground and slab scope on a typical Sunrise Manor lot, longer if the sewer requires a new tap at the main.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices You’ll Make Before We Break Ground

Site prep and utilities aren’t a single spec. These are the forks in the road, and the honest trade-off on each.

  • Utility trench depth and route: A shallow, direct run saves money and time. A deeper run (below frost is not the concern here, but below future landscaping and driveway loads is) costs more but survives a driveway pour or a future paver patio over the top. If you’re thinking about hardscape later, tell us now.
  • Electrical service: sub-panel from the house vs. a new meter: A sub-panel off the main house panel is cheaper and simpler, but the ADU shares the house’s capacity. A separate meter gives the casita its own account and is the right call if you plan to rent it. It adds cost and a utility coordination step.
  • Sewer connection: tie into the existing lateral vs. new tap at the main: Tying in is the budget path on most Sunrise Manor lots. A new tap is required when the existing line is undersized, too shallow, or the run crosses a property line in a way the county won’t allow.
  • Slab vs. raised pier foundation: Slab-on-grade matches the surrounding tract homes and is the lower-cost option. A raised pier foundation suits a site with drainage problems or a prefab unit that’s engineered for it, at higher cost.
  • Prefab shell vs. site-built: A Tuff Shed or similar outbuilding for storage needs only a pad and a single circuit. A full ADU under a Mighty Buildings or Plant Prefab shell needs the full utility set. Decide the structure type before we size the trench.
  • Gas vs. all-electric: Running gas is one more trench and one more inspection. An all-electric casita (heat pump water heater, mini-split) skips the gas line entirely and is worth considering given how hard the summer sun works the cooling load.

Our technicians have up to 12 years of experience on this scope, and the choices above are the ones we walk every homeowner through before a single line is staked.

What ADU Site Prep & Utilities Costs in Sunrise Manor, NV

A framer checking new wall framing on a home addition

Plan on $45,000 – $130,000 for the prep and utility scope on a Sunrise Manor ADU, with the spread driven almost entirely by how far the services have to travel and how much of the existing site has to come out first. This is the ground-work number that sits inside a full Home Additions & ADU in Sunrise Manor budget, and it’s the number that most often surprises people, because it’s invisible once the structure is standing.

What pushes a job toward the high end:

  • Distance from the main: Every additional foot of trench for water, sewer, power, and gas is linear cost. A casita set 80 feet back costs meaningfully more to serve than one 20 feet off the house.
  • Existing site condition: Old concrete, mature trees with root systems in the trench path, or a yard that’s graded toward the house all add demo and re-grading.
  • New sewer tap or utility upgrade: A new tap at the main and any panel upgrade to carry the ADU’s load can add a significant chunk on their own.
  • Foundation type and drainage: Raised piers and engineered drainage add cost over a straightforward slab.
  • Permit scope: Utility connections that require separate inspections and final sign-offs extend the timeline and the administrative cost.

A written estimate from us breaks out trenching, underground materials, slab, inspections, and the utility coordination fee line by line. What it doesn’t include is the ADU structure itself, finish work, or appliances, which live on the build budget. Upfront pricing means the number you see is the number you pay.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Sunrise Manor Homes Specifically Do to This Job

Sunrise Manor is an unincorporated Clark County township, not an incorporated city, so permits and inspections run through Clark County rather than a municipal building department. That’s a real difference from working in North Las Vegas or Henderson, and it changes who you call for inspection scheduling and how the utility coordination gets routed. The housing stock adds its own wrinkle. Much of the 89110 area is 1950s – 1990s single-story stucco-on-frame tract homes on slab-on-grade foundations, and the sewer laterals under those lots are now decades old. Before we stake an ADU footprint, we verify the existing lateral’s depth and condition, because tying a new casita into a failing line is a problem you don’t want to discover after the slab cures. The flat valley floor also means site grading has to solve for stormwater in a way most out-of-area contractors underestimate: monsoon-season runoff pools where the ground is flat, so we set positive slope on day two, not after the fact. Homeowners on the tract streets off Sahara and Lamb often pair this with Concrete Driveways & Concrete Work in Sunrise Manor so the trench path and the new driveway get poured to the same grade, and plenty pair it with Paver Driveways in Sunrise Manor to hide the utility stub paths under a finished surface.

Serving Sunrise Manor, NV – Our Local Coverage Area

We serve Sunrise Manor and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked: ADU Site Prep & Utilities in Sunrise Manor

A new wood side gate with black hardware

Get a Free On-Site Estimate for ADU Site Prep & Utilities in Sunrise Manor

A free on-site estimate is the next step. We walk the lot with you, locate the existing services, and hand you a written, line-item number for site prep and utilities in Sunrise Manor before you commit to anything. Live person, 24/7 on the phone. We cover the whole Sunrise Manor area, and every project is behind the 730-Day Done Right Promise. Call (844) 320-6757 to schedule your free estimate.

Written by the team at Groundwork Construction Co.

Why Sunrise Manor Chooses Groundwork Construction Co. of Henderson

We set the standard for ADU site prep & utilities in Sunrise Manor.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Sunrise Manor

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Sunrise Manor Customers Say

Trusted by homeowners across Sunrise Manor and surrounding areas.

★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A walk-in shower with large-format tile and a built-in nicheA standing-seam metal roof over a covered porchA new bay window with a cushioned seatA new concrete driveway with a paver borderA new paver patio with a seat wall and fire pitA remodeled primary bathroom with a soaking tub and walk-in shower

More services in Sunrise Manor

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Henderson

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Henderson team

A local vetted partner works across Henderson and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Site Prep & Utilities in Sunrise Manor?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Sunrise Manor.

(844) 320-6757

Request a Free Estimate in Sunrise Manor

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch