A Groundwork company - serving Henderson, NV
A new rear addition with a vaulted beamed ceiling and tall windows
New Detached ADU · Henderson, NV

New Detached ADU in Henderson - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Henderson
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
A new bay window with a cushioned seat
A new wood side gate with black hardware
A new concrete driveway with a paver border
A stone counter, tile backsplash and open shelf after a kitchen remodel
A remodeled hall bathroom with subway tile and a floating vanity
New architectural shingles with a clean valley
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

New Detached ADU in Henderson, NV: What It Takes and What It Costs

A new detached ADU in Henderson typically runs $45,000 – $130,000 for the structure itself, with full builds that include separate utility runs, kitchenettes, and bath finishes landing closer to the top half of that range. Plan on 4 to 7 months from signed contract to final inspection, and add 6 to 10 weeks up front for City of Henderson plan review and your HOA’s architectural review. Call (844) 320-6757 and we’ll walk your lot and community standards before you commit to anything.

Call (844) 320-6757

How Groundwork Builds a Detached ADU in Henderson, Start to Finish

A garage converted into a guest room and home office

The sequence below is what actually happens, in order, with realistic durations. Every stage has a homeowner decision attached, and we flag it before we get there so nothing stalls.

Stage 1: Site walk and feasibility (week 1)

We measure setbacks, locate the sewer lateral and water main, check the panel capacity, and photograph the side yard or rear lot line where the unit will sit. You decide the footprint and how close to the property line you’re willing to push it. In sloped Anthem and Seven Hills lots this is also where we identify whether grading or a retaining wall enters the budget.

Stage 2: Design and HOA architectural review (weeks 2 through 8)

Drawings go to your community’s architectural review board before or alongside the City of Henderson submittal. This is the stage that catches most Henderson homeowners off guard. You decide roof pitch, exterior finish, window style, and color, and those choices need to match what your CC&Rs already allow. We prepare the ARB packet so the submittal reflects the community’s approved palette from the first pass.

Stage 3: Permits and utility trenching (weeks 8 through 14)

City plan review runs 4 to 8 weeks on a detached unit, and we don’t break ground until the permit is in hand. Once it is, the first physical work is trenching for the separate sewer, water, and electrical feed from the main house. You decide whether the unit gets its own meter or sub-meter off the house panel.

Stage 4: Foundation, framing, and rough-in (weeks 14 through 22)

Slab or stem-wall foundation goes in first, then framing, sheathing, and roof. Rough electrical, plumbing, and HVAC follow, then the first inspections. Concrete work happens in early-morning pours because summer highs here push past 100°F and we won’t place concrete into that heat.

Stage 5: Finishes and final inspection (weeks 22 through 30)

Stucco, drywall, cabinets, counters, fixtures, flooring, and paint. You decide finish grades at the front end of this stage, not the back. Final inspections and a walkthrough close it out, and the work is covered by our 730-Day Done Right Promise.

All of this sits inside the wider scope of Home Additions & ADU in Henderson, so if your project grows into a connected addition the planning carries over.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices That Shape Your Detached Unit

Most of the decisions that move your price and your long-term satisfaction come down to these:

  • Foundation type: A standard slab suits flat Green Valley lots and costs less. Stem-wall or pier-and-beam handles grade changes on sloped southern Henderson lots, but adds cost and engineering. Trade-off: flat is cheaper; sloped lots need the stronger option.
  • Exterior finish: Stucco matches the surrounding housing stock and holds up through desert thermal cycling. James Hardie fiber cement is an alternative with different maintenance. Trade-off: stucco blends with the community; fiber cement can be a cleaner match where the HOA requires a specific profile.
  • Windows: We use impact-rated and energy-rated glazing, and brands like CWS and ES Windows are common on Henderson ADU projects. Trade-off: better glazing costs more up front and cuts summer cooling load.
  • Roof: Tile matches the neighborhood look; a shingle or standing-seam metal roof changes the profile. HOA approval on pitch and material often decides this before you do.
  • Interior layout: Studio, one-bedroom, or one-bedroom-plus-den. Trade-off: the den adds square footage and flexibility; a studio keeps the budget toward the low end.
  • Kitchenette vs. full kitchen: A kitchenette with a sink, fridge, and microwave keeps plumbing simple. A full kitchen with range and venting costs more and adds inspection steps.

What a New Detached ADU Costs in Henderson, NV

A framer checking new wall framing on a home addition

The market range for this job in Henderson is $45,000 – $130,000. Where your project lands depends on these variables more than anything else:

  • Size: A compact studio toward $45,000 – $70,000; a larger one-bedroom or den unit pushes toward $100,000 – $130,000.
  • Site conditions: Flat lots keep the foundation straightforward. Sloped Anthem and Seven Hills lots with clay or caliche can add grading, soil correction, or an engineered retaining wall.
  • Utility runs: Distance from the main house to the unit matters. A long trench across a finished yard adds labor and irrigation repair.
  • Finish grade: Standard cabinets and counters versus upgraded ones, tile versus laminate flooring.
  • HOA requirements: A community that mandates a full architectural package, specific colors, and a particular roofline can add review time and, occasionally, material cost.

A written estimate from us itemizes foundation, framing, utilities, finishes, permits, and HOA submittal prep. It does not typically include landscape restoration beyond the trench line, furniture, or appliances you choose to add yourself. The number you see is the number you pay, with no change orders for work we scoped.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Henderson Homes Specifically Do to a Detached ADU Project

Henderson was largely built out through the 1990s and 2000s as master-planned communities – Green Valley, Anthem, Seven Hills – which means most of our ADU work happens on lots whose original grading and utility layout weren’t drawn with a second dwelling in mind. The City of Henderson permitting overlays and your community’s HOA design-review board both get a say, and the HOA side is where projects most often stall: a color, window style, or roof pitch that doesn’t match the approved palette sends the packet back. In the foothill communities like Anthem and Seven Hills, contractors here routinely deal with expansive clay and caliche layers plus steep lot grading that require engineered retaining walls and soil correction, and that is where a foothill lot diverges from a flat-lot build. We prepare ARB submissions against the community’s standards from the first pass, keep quiet-operation requirements in mind for shared lot lines, and match exterior panels and finishes to what the neighborhood already approved so you avoid a violation notice after the unit is up. If your project also includes hardscape, homeowners often pair a new unit with Concrete Driveways & Concrete Work in Henderson to extend the access path to the door.

Serving Henderson, NV – Our Local Coverage Area

We serve Henderson and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – New Detached ADU in Henderson

A wood double vanity with two mirrors after a bathroom remodel

Get a Free Estimate for Your Henderson Detached ADU

Call (844) 320-6757 to schedule a free on-site estimate. We walk the lot, check utility and setback realities, and come back with a written, itemized quote and a realistic timeline. If your plans extend as far as a patio, a paved path, or driveway access, we can talk through Paver Driveways in Henderson at the same visit. Explore the full scope of our Home Additions & ADU work, or check the wider Henderson service area if you’re nearby.

Written by the team at Groundwork Construction Co.

Why Henderson Chooses Groundwork Construction Co. of Henderson

We set the standard for new detached ADU in Henderson.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Henderson

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Henderson Customers Say

Trusted by homeowners across Henderson and surrounding areas.

★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
New double-hung windows in a dining roomA new front yard fence with a matching gateA new paver pool deckAn open kitchen and dining area after a remodelA freestanding soaking tub in a remodeled primary bathroomA newly finished roof with a ridge vent and step flashing

More services in Henderson

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Henderson

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Henderson team

A local vetted partner works across Henderson and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in Henderson?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Henderson.

(844) 320-6757

Request a Free Estimate in Henderson

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch