







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Spring Valley, NV: What the Job Really Involves
Cabinets & countertops in Spring Valley typically run $14,000 – $45,000 when the work covers a full run of new cabinets, stone counters and an island, and most of that cost is cabinetry and stone, not labor. A cabinet-only swap lands closer to $4,000 – $13,000 and counters alone at $2,000 – $6,500. Plan on three to five weeks from demolition to final caulk when the layout stays put. Call (844) 320-6757 for a free estimate.
How We Sequence Cabinets & Countertops Work

The order matters more than most homeowners expect, because the stone can’t be templated until the boxes are set and level. Here’s how the job actually runs.
Day 1: field measure and demo. We measure the existing room, check wall plumb and floor level, and pull the old cabinets and counters. On a typical Spring Valley tract home the walls are rarely square, so we note the shims and filler strips before anything is ordered. You decide whether we’re keeping the existing sink and faucet or replacing them.
Days 2 – 3: rough-in adjustments and cabinet set. If anything moves, this is when it happens: a relocated dishwasher line, a new outlet for a built-in microwave, a shift of the range. Cabinets go in, get shimmed, leveled and screwed to studs, and the island gets anchored if you’re adding one ($3,000 – $10,000 depending on size and door style). You lock in door style, finish and hardware pulls before the order ships.
Days 3 – 4: template. The stone fabricator measures the installed boxes. That template is what gets cut, so any change after this point means a re-template and a delay. Decide the edge profile and overhang now.
Days 7 – 10: countertop install. Slabs arrive, get set, seamed and caulked. Sink cutouts and faucet holes are drilled at the shop from the template. You confirm sink model and faucet before this step, not after.
Days 10 – 21: finishing. Backsplash goes in, toe kicks and panels get fitted, drawers and doors get adjusted, and we do a final walkthrough with you to check every door and drawer front. Most of the gap in that window is stone fabrication time, not our schedule.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Choose Between
Cabinets and counters are two separate product decisions, and the trade-offs run in different directions.
- Stock versus semi-custom cabinets. Stock sizes reach you in days and cost less, but they force compromises on filler strips in odd corners. Semi-custom (KraftMaid is a solid middle ground) builds to the inch and offers more door styles and finishes. Full custom costs the most and takes the longest.
- Plywood versus particleboard boxes. Plywood holds screws better and survives moisture; particleboard is cheaper and fine in dry interior use. In a Spring Valley kitchen with a dishwasher and sink nearby, we lean plywood.
- Quartz versus granite versus butcher block. Quartz (Cambria, for example) is non-porous and doesn’t need sealing; granite is natural stone, more heat-tolerant, and needs periodic sealing; butcher block is warm and repairable but wants oiling and hates standing water. Quartz is the most common pick here.
- Slab thickness and edge. 2cm slabs need a built-up edge; 3cm is standard and reads heavier. A fancy edge profile adds machine time and money.
- Drawers versus doors. Full-extension soft-close drawers cost more per unit but change how a kitchen works day to day. Worth the upgrade in base cabinets.
What Cabinets & Countertops Costs in Spring Valley, NV

For a full kitchen’s worth of new cabinets and stone counters in Spring Valley, budget $14,000 – $45,000. Here’s how the line items break down.
| Line item | Typical range |
|---|---|
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Kitchen island installation | $3,000 – $10,000 |
| Backsplash installation | $800 – $2,500 |
What pushes a job to the top of that range: linear footage (a 10-foot run versus a 25-foot run is the single biggest factor), material grade on the cabinets and slabs, whether plumbing or electrical has to move, an island or peninsula added where none existed, and structural changes like removing a wall or patching a soffit. A job that keeps the existing layout and swaps boxes and tops sits near the bottom; one that relocates the sink and adds an island lands high.
A written estimate from us lists cabinets, counters, island, backsplash, demo, haul-away, and any permit fees as separate lines, so you can see exactly what you’re paying for before you sign. What it won’t cover is appliance purchase, painting, or flooring, unless you ask for those to be included in the scope. Our Kitchen Remodeling team handles the surrounding work if you want the full kitchen done at once.
See the difference
Before
After
Before
After
Before
AfterWhat Spring Valley Homes Specifically Do to This Job
Spring Valley’s 89113 ZIP covers two very different kinds of kitchens. In the 1990s and 2000s stucco-and-frame tract homes off the cul-de-sac subdivisions, we’re usually replacing tired oak cabinets and laminate counters that have seen thirty summers of heat cycling, often on walls that have settled unevenly. Up the foothills toward the Spring Mountains, on the semi-custom and custom builds, we’re matching existing finishes and dealing with larger, more complex layouts.
The foothills properties bring a complication most kitchens don’t: some of these larger-lot homes are still on private wells and septic, a setup the county still allows here that you won’t find inside the City of Las Vegas or Henderson. That doesn’t change how a cabinet hangs, but it does shape the project, since a well or septic service can’t be scheduled around a kitchen install without coordination. We also plan around summer afternoon monsoon runoff on the western edge of the 89113 ZIP, where a dry desert wash can turn into a fast-moving muddy torrent in minutes, and where temperatures above 110°F cut the working window for any exterior work tied to the job. Interior cabinet and counter installs are less weather-sensitive, but material deliveries and slab handling get scheduled around the heat.
Permitting: a straight cabinet and counter swap generally doesn’t trigger a building permit, but moving plumbing, gas or electrical does, and we pull it as part of the job. If you’re knocking out a wall, that’s structural and gets inspected. Which brings up the wider project: if the kitchen is part of a full Kitchen Remodeling in Spring Valley, we sequence the trades so the cabinets and counters aren’t sitting in a construction zone. We cover all of Spring Valley, including the 89113 ZIP, and homeowners often pair a kitchen refresh with a Garage Conversion ADU in Spring Valley or a New Detached ADU in Spring Valley while the equipment is already on site.
Serving Spring Valley, NV – Our Local Coverage Area
We serve Spring Valley and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Cabinets & Countertops in Spring Valley

Most jobs run three to five weeks from demo to final walkthrough, and the single biggest variable is stone fabrication time, which usually accounts for five to seven working days of that window. Call (844) 320-6757 for a timeline specific to your kitchen.
A pure cabinet and counter replacement typically doesn’t require a building permit, but relocating plumbing, gas or electrical does. If you’re removing or moving a wall, that’s structural work and gets inspected. We handle the permit pull as part of the job and walk you through what’s required.
Yes, and it’s the most common way we do it: like-for-like replacement with the sink and range staying where they are. You save on plumbing, electrical and drywall repair, and the project stays near the low end of the $14,000 – $45,000 range.
Expect $14,000 – $45,000 for a full kitchen’s worth of new cabinets and stone counters, with cabinets alone at $4,000 – $13,000 and counters at $2,000 – $6,500. Cabinetry material, linear footage and whether you move plumbing or add an island are the biggest drivers. Call (844) 320-6757 for an exact quote, and estimates are free.
Every cabinets and countertops project we do is covered by our 730-Day Done Right Promise: if it’s not done right, we make it right. That’s one of the longest workmanship guarantees in residential construction, and it’s in writing.
Get a Free Estimate for Cabinets & Countertops in Spring Valley
We’ll come out, measure the actual room, and hand you a written line-item estimate for cabinets, counters, island and backsplash, with the permits and haul-away spelled out so nothing surprises you later. Calls are answered by a live person, 24/7. Financing is available at 0% for 18 months, and projects over $10,000 get $1,000 off. Call (844) 320-6757 to schedule your free estimate.
Written by the team at Groundwork Construction Co.












