







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Trusted Kitchen Remodeling for Henderson Homeowners
Kitchen remodeling in Henderson runs $14,000 – $45,000 for a full remodel, and the price swings mostly on cabinet and countertop choices, layout changes, and whether any plumbing or electrical has to move. Most of the homes we walk into here share the same two problems: a kitchen closed off from the living space, and builder-grade materials from the late 1990s or early 2000s still hanging on. Our technicians have up to 12 years of experience and have worked kitchens in every corner of Henderson, from Green Valley to Anthem, and they’ll tell you straight what your kitchen actually needs rather than padding the scope. We answer the phone with a live person 24/7, so you’re not waiting until Monday to get a real answer. Call (844) 320-6757 to schedule a free estimate and design consult.
What Our Kitchen Remodeling Service Includes

Every kitchen we take on is different, but the trades and the sequencing are the same. Here’s what’s available under one roof, from first sketch to final walkthrough.
Full Kitchen Remodeling
A full kitchen remodel guts the room to the studs and rebuilds it: new cabinets, counters, flooring, backsplash, lighting, plumbing fixtures, and paint. You need it when the cabinet boxes are failing, when the layout wastes half the room, or when you’re finally ready to open the wall to the living area. Groundwork Construction Co. of Henderson handles the whole scope from foundation to finish line, with one crew accountable from demo to final walkthrough, backed by the 730-Day Done Right Promise.
Cabinets & Countertops
Cabinets are the single biggest line item in any kitchen and the thing that most dates a room. We help you choose between KraftMaid, Cambria and the other brand partners we work with, measure to the wall (not to the drawing), and template counters after cabinets are set, so miters line up and stone doesn’t get ordered blind. This is the job when the doors sag, drawer boxes are falling apart, or the laminate edge is peeling up from the dishes.
Backsplash
A backsplash protects the drywall behind the range and sink from steam, grease, and the water that quietly rots kitchens from the inside. We set tile with the right substrate and the right thin-set for your material, whether that’s ceramic subway, porcelain slab, or glass, and we caulk the counter and cabinet joints instead of grouting them so they don’t crack when the house moves. This is the small project with outsized visual payoff, and it’s usually scheduled to finish the room after the counters go in.
Tile & Flooring
Henderson kitchens take a beating from hard water, hot summers, and the thermal cycling that comes with the climate. We install porcelain and ceramic tile, luxury vinyl plank that handles the sink splash zone, and wood-look flooring that holds up to a family that actually cooks. We check the subfloor for flatness before we lay anything, because a floor that moves underfoot will crack grout lines within a year.
Kitchen Design & Layout
Good design is about how you move and where you stand, not what the magazine spread looks like. We measure your appliances, your reach, and the way your household actually uses the space, then work a layout that respects the work triangle without forcing a peninsula where nobody has room to walk. If a wall needs to come out or a door needs to move, we pull the permits and coordinate the electrical and plumbing so the design doesn’t become a surprise on demo day.
Small & Partial Kitchen Remodels
Not every kitchen needs a full gut. A small or partial remodel might be new counters and a backsplash, refacing the doors, or replacing a failing appliance wall without touching the rest of the room. Small kitchen remodels in Henderson generally run $9,000 – $20,000, and we’re honest when a partial remodel will get you the result you want rather than selling you a full gut you don’t need.
Cabinet Installation & Refacing
Cabinet installation runs $4,000 – $13,000 and is where most of the fussiness lives: plumb walls, level boxes, doors that gap, and the sink and range cutouts that don’t line up. When the boxes are still solid but the doors and finishes are dated, refacing keeps the existing frames and replaces the front, which saves money and keeps the demo dust down. We’ll tell you which path makes sense after we’ve looked at what’s actually behind the doors.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Brands We Service for Kitchen Remodeling
We work with a curated set of brand partners so that quality is the standard, not an upgrade you have to fight for. KraftMaid cabinets and Cambria quartz give you kitchen choices that hold up to real use, while Kohler fixtures handle the sink and faucet side. Those brands earned their place because we’ve installed enough of them to know how they fail and where they hold, and we spec them because they last, not because a sales sheet said so. Built to last, backed in writing.
Outside the kitchen, our brand partners run across every trade we touch, from GAF and Owens Corning on roofs to Andersen and Pella on windows to Boral for that kitchen pass-through trim, and there’s a reason we keep that list short. Whether you have KraftMaid in mind or any other make, we can help you get the material that fits your budget and your kitchen, and you’re not locked into one brand just because it happens to be in stock.
Signs You Need Kitchen Remodeling Right Now
- Cabinet boxes are swelling or soft near the sink. Water gets behind the doors and the particleboard absorbs it until the box fails. Once a drawer bottom sags, the whole run is on borrowed time.
- Counters are cracked, chipped, or peeling at the edge. A cracked counter is a moisture trap and a knife snag waiting to happen. Laminate that’s lifting at the edge is a sure sign the substrate underneath is done.
- You’re using extension cords and power strips in the kitchen. Older kitchens weren’t wired for the appliance load of a modern house. That’s an electrical safety issue, and an electrician should take a look before you do anything else.
- The layout fights you every day. If the stove, sink and fridge are spread out so far you cross the room to drain pasta, or the dishwasher door blocks a walkway, that’s a layout problem a remodel can actually solve.
- The grout lines are cracked and the tile is lifting. Cracked grout in a kitchen usually means movement underneath, not just age. Left alone, it turns into a floor that has to come up.
Our Kitchen Remodeling Process – Step by Step
- 1
In-home consultation and measurement. We come out, measure the room and the walls, look at the plumbing and electrical, and ask how you actually cook. No pressure, no price sheet shoved in your hand.
- 2
Design and written line-item estimate. We put the layout and the material selections on paper next to a fixed-price quote, so you see exactly what each line costs and there’s no change-order guessing later. Upfront pricing, no surprises.
- 3
Permits and scheduling. If the plan moves a wall, plumbing or electrical, we pull the permits and coordinate the inspection. You get a schedule with dates, not a vague window.
- 4
Demo and rough-in. The crew tears out the old kitchen, checks for hidden water damage or old wiring, and handles any structural surprises before the new work goes in. That’s where the diagnostic skill actually pays off.
- 5
Install, final walkthrough, and warranty. Cabinets, counters, backsplash, tile and paint go in, then we walk the room with you and fix anything on your list. The finished work is covered by the 730-Day Done Right Promise.
See the difference
Before
After
Before
After
Before
AfterHow Much Does Kitchen Remodeling Cost in Henderson?

A full kitchen remodel in Henderson runs $14,000 – $45,000, and the top of that range usually means layout changes, new plumbing and electrical, and premium stone. A small kitchen remodel runs $9,000 – $20,000. Cabinet installation alone runs $4,000 – $13,000, and cabinet refacing sits at the lower end of that. Countertop installation runs $2,000 – $6,500 for most Henderson kitchens, backsplash installation runs $800 – $2,500, and a kitchen island installation runs $3,000 – $10,000 depending on size and whether it needs a new electrical drop.
What moves the price: cabinet construction and door style, counter material (engineered quartz versus natural stone), whether walls come out, and how much plumbing and electrical has to move. What keeps prices honest: a written line-item estimate, fixed pricing rather than hourly billing, and picking materials before demo rather than during. Every free estimate from us includes the design consult, a line-item written quote, and a materials walk-through so you know what you’re paying for before you sign. We also have 0% financing for 18 months and $1,000 off projects over $10,000, which goes a long way on a kitchen this size. Don’t overpay for a full gut if a partial remodel gets you the kitchen you actually want.
Kitchen Remodeling Near Henderson – Our Service Area
We serve Henderson and the surrounding valley, including Kitchen Remodeling in Boulder City to the east, Kitchen Remodeling in Whitney just across the river, and further out to Paradise, Winchester, Enterprise, Sunrise Manor, Spring Valley, Summerlin, North Las Vegas, Las Vegas and Sandy Valley. Midday traffic on the 515 and I-215 shapes our scheduling, so we coordinate crew timing around it rather than making you wait on a van stuck in the afternoon backup. Whether your kitchen is in a Henderson tract home or an older Boulder City bungalow, one call gets a real answer.
Serving Henderson, NV – Our Local Coverage Area
We serve Henderson and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked Questions – Kitchen Remodeling in Henderson

Kitchen remodeling is the full tear-out and rebuild of a kitchen’s functional core: cabinets, counters, backsplash, flooring, lighting, plumbing fixtures and paint. It can be a small partial remodel that changes only counters and cabinets, or a full gut with a new layout. Groundwork Construction Co. of Henderson handles all of it under one roof, with one crew accountable for the whole job.
A full kitchen remodel in Henderson typically takes 4 – 8 weeks from demo to final walkthrough, depending on the scope. A small or partial remodel usually runs 2 – 3 weeks, while a full gut with layout changes and new plumbing can push toward 8 weeks. We give you a dated schedule up front and tell you when the permits and inspections fall.
A full kitchen remodel in Henderson runs $14,000 – $45,000, a small kitchen remodel runs $9,000 – $20,000, and cabinet installation runs $4,000 – $13,000. The biggest cost drivers are cabinet construction, counter material, and whether walls or utilities move. Call (844) 320-6757 for an exact quote – estimates are free.
Yes, we install KraftMaid cabinets and Cambria quartz counters as part of our curated brand partner list. We’ve installed enough of both to know how the doors and boxes fit in real Nevada walls and how the counters template after the cabinets are set. Whether you have KraftMaid and Cambria in mind or a different brand, we can help you find the right fit.
No, and that’s the point of the way we quote. Your estimate is fixed and line-itemed, so the price you sign is the price you pay unless you ask for a change to the scope. If we open a wall and find something no one could have seen, we stop and show you before we touch it, and it’s a change you approve, not a surprise on the invoice.
Yes. Every kitchen we build is covered by the 730-Day Done Right Promise, which means if something isn’t done right within that window, we come back and make it right. That’s one of the longest workmanship guarantees in the residential construction space. It’s in writing, and it’s the reason we’re careful about the details the first time.
Clear the cabinets, empty the fridge, and set up a temporary kitchen in another room with the microwave and a folding table so you’re not eating out every night. Expect some dust and traffic in the hallway, and plan around the days when the water and power are off. We’ll give you a day-by-day schedule so you know exactly what’s happening and when. Call (844) 320-6757 to get the plan started.
Schedule Your Kitchen Remodeling Service in Henderson Today
Get the kitchen you’ve been putting off with a free project estimate and design consult from Groundwork Construction Co. of Henderson. We answer the phone with a live person 24/7, so call (844) 320-6757 whenever it’s convenient, and we’ll get a real date on the calendar. Our technicians have up to 12 years of experience, every job is backed by the 730-Day Done Right Promise, and the number you see is the number you pay. No-obligation estimate, no pressure.
Written by the team at Groundwork Construction Co.












