New Detached ADU in Paradise, NV: What It Costs and How Long It Takes
A new detached ADU in Paradise typically runs $45,000 – $130,000 for the structure itself, with full turnkey units landing at the top of that band once you add kitchen, bath, and utility connections. Plan on 4 – 7 months from approved plans to final inspection for a standard 500 – 800 sq ft unit, longer if your lot sits in a resort-corridor overlay with extra fire and life-safety review. Call (844) 320-6757 to schedule a free on-site estimate. Our technicians have up to 12 years of experience on detached units, and the work is backed by our 730-Day Done Right Promise.
How We Build a Detached ADU, Stage by Stage

Most homeowners picture handing over a drawing and picking a paint color. The reality is a sequence where every stage locks in a decision you can’t easily reverse later. Here’s what actually happens.
Stage 1: Site visit and layout (week 1)
We walk the yard, measure the setback from your rear and side property lines, and check where the utility runs enter the existing house. You decide the placement and orientation then. A unit facing the morning sun on the east side of your lot will run cooler in July than one baking on the west, and the Mojave heat makes that a real choice, not a cosmetic one. We also confirm what your lot allows before you spend a dollar on design.
Stage 2: Permit submission (weeks 2 – 10)
We submit plans to Clark County and shepherd them through plan review. Response time depends on the volume at the county and whether your parcel touches a resort-corridor overlay, which can add a fire and life-safety review cycle on a separate track. You decide nothing at this stage except approving any plan-check comments; we handle the back-and-forth. No construction starts before the permit is in hand.
Stage 3: Site prep and foundation (weeks 10 – 14)
We clear and grade, then pour the slab or set stem walls. In Paradise, concrete pours get scheduled for early morning through the summer, since summer highs routinely push past 105°F and a mid-day pour cures badly. You’ll see the slab, the utility trenching, and the rough plumbing and conduit stub-ups before anything goes vertical.
Stage 4: Framing, roofing, and exterior (weeks 14 – 22)
The shell goes up, the roof gets dried in, and windows and doors are set. You decide materials here – roofing type, cladding, window rating – and that decision drives a big chunk of the final budget. Rough electrical, plumbing, and mechanical inspections happen before the walls close.
Stage 5: Finish-out and final inspection (weeks 22 – 30)
Insulation, drywall, flooring, cabinets, fixtures, and paint. You pick finishes at the start of this stage, not the middle, because lead times on cabinets and specialty doors can stall a job. Final inspection closes the permit, then we hand you the warranty documents.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Actually Choose Between
Detached ADUs give you more latitude than an attached addition, and that’s exactly why the spec conversation matters. Here’s where your money goes and what each choice buys you.
- Unit size: A 500 sq ft studio keeps you near the low end. An 800 sq ft one-bedroom pushes toward the top. Smaller units cost less but limit who can rent them or who in your family can live there comfortably.
- Roofing: Standing-seam metal (we install Atlas and Tamko products where they suit the design) reflects heat and lasts decades, but costs meaningfully more up front than composition shingle. Given the summer sun here, metal pays back on cooling load. Shingle is the budget choice.
- Windows and doors: Impact-rated or high-wind-rated units matter more than most homeowners expect. PGT and Boral make products in this class. The trade-off is cost versus resilience – a standard window will survive most days, but a wind-rated assembly is what protects the unit through a monsoon microburst.
- HVAC: A ductless mini-split system is cheaper to run for a small unit and simpler to install. A full ducted system costs more but handles an 800 sq ft unit with multiple rooms better.
- Kitchen and bath finishes: Builder-grade versus mid-tier cabinets and counters can swing the number by $10,000 or more. You decide quality here; we don’t pick for you.
- Utilities: Running a new sewer lateral versus tying into existing plumbing, and whether the panel can carry the added load, are the two cost wildcards. We assess both before you commit.
What New Detached ADU Costs in Paradise, NV

The range for a new detached ADU in Paradise is $45,000 – $130,000 for the structure, with larger turnkey units reaching the higher end once utilities, finishes, and appliances are included. Five things move that number most:
- Size and bedroom count: every additional room adds framing, electrical, and finish area.
- Utility distance: a unit 80 feet from the main panel and sewer tap costs far more to connect than one 20 feet away.
- Site conditions: slope, drainage, and soil prep on a backyard that collects monsoon runoff.
- Material grade: metal roof and impact windows versus shingle and standard glazing.
- Permit and review scope: a parcel in a resort-corridor overlay with extra reviews adds time and fees.
A written estimate from us is line-item: foundation, framing, roofing, utilities, finishes, permits, and inspection all listed separately, with fixed pricing and no change orders on scope we’ve already priced. What’s typically not included unless you ask: landscaping repair after trenching, furniture, and any HOA application fees. Call (844) 320-6757 for an exact quote – estimates are free.
See the difference
Before
After
Before
After
Before
AfterWhat Paradise Lots Specifically Do to This Job
Paradise is mostly commercial and hospitality ground – the Strip resorts, the Convention Center district, condo towers, and apartment complexes – and the single-family lots that do exist are scattered and often older. That shapes a detached ADU build in two ways. First, permit review here can move on the resort-corridor track rather than a plain residential track, and a parcel near Las Vegas Boulevard or the Convention Center district sometimes triggers fire and life-safety review that adds weeks. Second, the housing stock on the residential pockets is older, which means we frequently find undersized electrical panels and original sewer laterals that need upgrading before a new unit ties in. If your lot collects water during a monsoon, drainage prep before the slab is non-negotiable. We cover Paradise including these scattered residential pockets, and when the ADU is part of a full Home Additions & ADU in Paradise scope, we plan the yard, utilities, and driveway together so the new unit isn’t landlocked. Homeowners often pair this with a Concrete Driveways & Concrete Work in Paradise pour for the new access path, or a Paver Driveways in Paradise finish for a more designed look. It all fits under our Home Additions & ADU service.
Serving Paradise, NV – Our Local Coverage Area
We serve Paradise and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – New Detached ADU in Paradise

Expect 4 – 7 months from approved plans to final inspection for a standard unit, with permit review alone taking 4 – 10 weeks depending on county volume and whether the parcel carries extra review. Call (844) 320-6757 to get a timeline estimate for your specific lot.
Yes. Every detached ADU requires a Clark County building permit, with separate electrical, plumbing, and mechanical inspections. We pull the permit and pass the inspections for you; no work starts before it’s issued.
Sometimes, but it depends on capacity. If your panel has room for the added load and the sewer lateral can carry another fixture load, we can often avoid a major upgrade. We check both at the site visit before you commit. Call for a free assessment.
The range is $45,000 – $130,000, with larger turnkey units at the top. Size, utility distance, material grade, and permit scope drive the difference. Call (844) 320-6757 for a written line-item estimate – it’s free, and the number you see is the number you pay.
The entire project is covered by our 730-Day Done Right Promise – if it’s not done right, we make it right. That’s one of the longest workmanship guarantees in the residential construction space, and it’s in writing.
Get a Free Estimate for Your New Detached ADU in Paradise
Call (844) 320-6757 to schedule a free on-site estimate for your new detached ADU in Paradise. A live person answers around the clock, so you won’t hit voicemail. We’ll walk your lot, confirm setbacks and utility capacity, and hand you a written line-item quote with fixed pricing – plus our standing $1,000 off projects over $10,000 and 0% financing for 18 months if you qualify. No pressure, just a real number.