A Groundwork company - serving Henderson, NV
A new rear addition with a vaulted beamed ceiling and tall windows
ADU Design & Permitting · Summerlin, NV

ADU Design & Permitting in Summerlin - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Henderson
A finished backyard cottage with a small covered porch
A single-story rear room addition with tall windows and a new patio
A new front entry door with glass sidelights
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
A galley kitchen opened up to the dining room with a new peninsula
A walk-in shower with large-format tile and a built-in niche
A standing-seam metal roof over a covered porch
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Summerlin ADU projects run $45,000 – $130,000 from first sketch through final inspection, and most take 7 to 11 months before anyone moves in. The work splits roughly into thirds: architectural drawings, permitting, and construction itself. Permitting alone eats 8 to 16 weeks in Clark County, and that clock doesn’t start until the drawings are complete. Call (844) 320-6757 for a free on-site estimate.

ADU Design & Permitting in Summerlin: what you’re actually buying

You’re buying a right to build. The design package (site plan, floor plan, elevations, structural calcs, and title-24 energy compliance) has to pass Clark County’s plan review and clear title 30 restrictions before a single permit is issued. Most Summerlin lots are governed by recorded covenants that add a second layer of review on top of the county.

Call (844) 320-6757

How our ADU Design & Permitting process runs, stage by stage

  1. 1
    Day 1 – site verification and lot check. We pull the parcel record and confirm setbacks, easements, and existing utility crossings. On Summerlin’s west-side lots, this is also when we flag caliche, because that cemented layer changes how the foundation gets built. You decide the ADU footprint and where it sits on the lot.
  2. 2
    Day 3 – schematic design meeting. You pick program: one-bedroom over garage, studio, or a two-bedroom unit. We bring three layouts at different price points. Most clients choose the middle plan. This meeting also locks the exterior finish so the design package is HOA-ready from the start.
  3. 3
    Weeks 2 – 5 – drawings and engineering. Architectural drawings, structural engineering, truss or engineered framing, and energy compliance. You approve the final plan set here. Changes after this point cost more and reset the schedule.
  4. 4
    Weeks 6 – 18 – permitting. We submit to Clark County, respond to reviewer comments, and file the HOA architectural request separately. Plan review on an ADU typically returns first comments in 4 – 6 weeks. Two rounds of comments is normal. You sign the HOA submittal and pay county fees at this stage.
  5. 5
    Weeks 19 – 28 – construction and inspections. Foundation, framing, rough-in, insulation, close-up, and final. Each inspection is scheduled in sequence with the county. You walk the finished unit with us at the end. The county final inspection is the last gate before you can legally occupy.
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The design and spec choices that decide your ADU

  • Attached versus detached. An attached ADU pulls shared wall and roof assemblies and typically runs $30,000 to $70,000 less than a detached build. A detached unit gives privacy and independent access but adds foundation, utilities, and roof scope.
  • Foundation type. On Summerlin’s west-side caliche, slab-on-grade is standard and usually the most economical. A raised floor or crawlspace costs more but leaves plumbing accessible for future changes.
  • Framing. Engineered wood framing is the default. Steel framing costs more and handles extreme heat with less expansion, but finding local crews for it is harder.
  • Roofing. Asphalt shingle in a pale, energy-rated color is the value pick. Tile lasts longer and reads as permanent in a Summerlin neighborhood; expect $4,000 to $9,000 more on a 700-square-foot ADU roof.
  • Windows and doors. Energy-rated windows are required by code. PGT builds windows rated for high heat and wind, and they’re a common choice here. A separate exterior door for the ADU entry is almost always worth the extra cost for privacy and HOA access requirements.
  • HVAC. A dedicated mini-split system costs less to run than extending the main house system. It also lets the tenant control their own comfort, which matters if the unit is ever rented.
  • Kitchenette finish level. Cabinet grade, countertop, and appliance package move the number more than any other interior line item. KraftMaid cabinetry is one option we stock through our partner network. Countertop choice (laminate, quartz, or solid surface) shifts the price $2,000 to $5,000 on a small galley kitchen.
  • Access and site work. Most Summerlin ADUs need a new driveway or walkway to a separate entrance. Homeowners often pair this project with a Paver Driveways in Summerlin job so the new entry matches the rest of the property.

What ADU Design & Permitting costs in Summerlin, NV

A remodeled family room with new windows and a window seat
Line item Typical range
Architectural drawings and engineering $8,000 – $22,000
Clark County permit and plan review fees $4,000 – $12,000
Site work and foundation (caliche included) $12,000 – $35,000
Structure and roofing $18,000 – $45,000
Mechanical, electrical, plumbing $8,000 – $20,000
Interior finishes and appliances $6,000 – $18,000
Total, 600 – 900 square feet $45,000 – $130,000

What pushes a Summerlin ADU to the low end: attached construction, modest finishes, an existing garage or utility stub to build from. What pushes it high: detached build, caliche that has to be broken out across the whole footprint, full kitchen and laundry, or an unusual lot shape that forces a custom foundation. We give a written line-item estimate so you see the number for each stage before signing anything.

What’s included in a written estimate from us: design work, permit fees, site work, structure, all trades, and inspection coordination. What’s not always included: HOA review fees, utility tap charges if a new connection is required, and any landscape restoration after construction. We list those separately so there are no surprises once work starts. Call (844) 320-6757 to schedule an estimate.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Summerlin homes specifically do to this job

Two things separate an ADU build in Summerlin from the same job in older Las Vegas neighborhoods. The first is the HOA. Summerlin’s communities enforce architectural design standards, and an ADU has to match the main house and the street. We prepare the architectural request as part of the design package so the county submittal and the HOA submittal go in together. The second is caliche. The cemented calcium-carbonate layer under most west-side lots has to be broken rather than dug, and that shows up in site work cost and schedule on nearly every foundation we pour in Summerlin. Summerlin lots are also newer than much of the valley: 1990s-to-present tract homes by a handful of production builders, with newer custom builds in the western foothills. We’re working on newer structures, not aging systems, which means the site is the variable, not the failing pipes. Homeowners often pair this work with a Chain Link Fence in Summerlin project to define the new ADU yard line before construction starts.

Serving Summerlin, NV – Our Local Coverage Area

We serve Summerlin and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked – ADU Design & Permitting in Summerlin

A framer checking new wall framing on a home addition

Get a free ADU Design & Permitting estimate in Summerlin

We’ll walk your lot, check the parcel record, and confirm what the county and your HOA will require before you spend a dollar on drawings. Bring your questions. We answer calls with a live person, 24/7, and every estimate is written line by line with fixed pricing. Call (844) 320-6757 to schedule your free estimate for ADU Design & Permitting in Summerlin. It’s part of the wider Home Additions & ADU in Summerlin work we handle, and you can see the full scope through our Home Additions & ADU service, including how we cover Summerlin.

Written by the team at Groundwork Construction Co.

Why Summerlin Chooses Groundwork Construction Co. of Henderson

We set the standard for ADU design & permitting in Summerlin.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Summerlin

Getting your ADU design & permitting project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU design & permitting project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU design & permitting pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Summerlin Customers Say

Trusted by homeowners across Summerlin and surrounding areas.

★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A remodeled primary bathroom with a soaking tub and walk-in showerA new clay tile roofNew double-hung windows in a dining roomA new front yard fence with a matching gateA new paver pool deckAn open kitchen and dining area after a remodel

More services in Summerlin

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Henderson

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Henderson team

A local vetted partner works across Henderson and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Design & Permitting in Summerlin?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Summerlin.

(844) 320-6757

Request a Free Estimate in Summerlin

Tell us about your ADU design & permitting needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch